PgMP Program Management Professional (PgMP) Questions and Answers

Questions 4

The project managers for component projects A and B schedule the same resource to perform tasks during the same timeframe, resulting in an over-allocation. The program manager reviews the program resource management plan, determines that project A can wait until the resource becomes available, and assigns the resource to project B.

This is an example of which of the following?

Options:

A.

Program resource management planning

B.

Program risk mitigation

C.

Resource interdependency management

D.

Project resource planning

Buy Now
Questions 5

Which of the following directs the improvement efforts to those areas that will have the biggest impact?

Options:

A.

Gantt chart

B.

Flowchart

C.

Pareto diagram

D.

User Documentation

Buy Now
Questions 6

What is the formula to determine earned value (EV) for a program?

Options:

A.

Percent complete times percent remaining in the program

B.

Percent completes time the program cost estimate

C.

Percent complete times the program budget at completion

D.

Percent complete times the program cost of labor and materials

Buy Now
Questions 7

You are the program manager for your organization and are working with your team to create the program scope management plan. This plan defines several things in your program except for which one of the following?

Options:

A.

How quality control will be included in the scope

B.

How changes may be allowed to enter the program scope

C.

How the program scope will be created for your program

D.

How the program scope will be controlled

Buy Now
Questions 8

One of the constituent project managers asks a new program manager to obtain approval for an additional key project requirement. A tolerance range is set.

If the tolerance range is too narrow on a program, what effect will multiple minor changes have on the program?

Options:

A.

Reduction in program quality

B.

Degradation of program communications

C.

Reduction in program risk

D.

Slow down in program implementation

Buy Now
Questions 9

On which of the following documents you work throughout the risk management processes?

Options:

A.

Risk management plan

B.

Project management plan

C.

Risk register

D.

Project charter

Buy Now
Questions 10

The project manager of project A develops a communications management plan. The project manager of project B is new and is uncertain how to develop appropriate communications for the company's staff.

What should the program manager do to ensure communications on the component projects are consistent?

Options:

A.

Request a more experienced project manager to work on project B.

B.

Create a program communications management plan across all component projects.

C.

Direct all projects to use project A's communications management plan as a template.

D.

Rework the communications management plans for all projects to be consistent.

Buy Now
Questions 11

To increase its presence and promote its products and services in new markets, a company begins to implement its new business strategy. The company’s CEO endorses a new program to promote and support this strategy. However, before the program is formally initiated, this strategy must be aligned with the organization’s strategic goals and objectives.

What should the program manager develop first?

Options:

A.

Program’s risk threshold

B.

Program risk management plan

C.

Program resource management plan

D.

Program risk and issue governance forum

Buy Now
Questions 12

A company is building a global monitoring network in 40 countries. The program completes the planning phase and a review is conducted of the program components’ strategic alignment with the intended program and company goals. The review identifies issues that should be resolved to improve program progress. One of the issues identified is the lack of incorporation of both software and configuration management tools.

Which of the following must be addressed?

Options:

A.

Program performance monitoring and controlling

B.

Program management information system (PMIS)

C.

Program delivery management

D.

Program roadmap

Buy Now
Questions 13

A company is evaluating the implementation of enterprise resource planning (ERP) software. The program manager performs an analysis to confirm the program's feasibility.

What other important step should the program manager complete?

Options:

A.

Development of the program's vision statement

B.

Review of strategic goals against any external environmental factors

C.

Identification and documentation of the initial risks for ERP software implementation

D.

Mapping of the financial benefits to the ERP software's functionality

Buy Now
Questions 14

The chief executive officer reminds a program manager that a program must deliver a 30% reduction in customer complaints by the end of the year.

Where is this expectation documented?

Options:

A.

Program quality standards

B.

Customer management plan

C.

Benefits management plan

D.

Benefits sustainment plan

Buy Now
Questions 15

You are the program manager for your organization. One of the projects within your program is to install 15,000 light fixtures throughout your organization's corporate campus. The new fixtures will save on electrical costs. Which one of the following choices is an ideal approach to quality assurance and the installation of the light fixtures for this project team?

Options:

A.

The cost and time of each installation should go down because of the learning curve.

B.

The project manager should work with the project team to understand how each fixture is to be installed.

C.

The project team members should develop their own system for installation of the fixtures.

D.

Use a checklist for the installation because it is repeatable work.

Buy Now
Questions 16

A project is assigned to a qualified project manager by the program manager. The client rejects the project manager due to a lack of proper qualifications to manage such a project.

What should the program manager do next?

Options:

A.

Reassess the project manager’s credentials

B.

Assign a different project manager

C.

Review the skill requirements of the project

D.

Apply the competence assessment techniques to resolve the issue

Buy Now
Questions 17

What is the other name for critical delivery dates?

Options:

A.

Substantial completion.

B.

Phases.

C.

Flags.

D.

Milestones.

Buy Now
Questions 18

What does CPI value less than 1.0 indicates?

Options:

A.

Cost overrun for work completed

B.

Scheduled performance is great

C.

Cost underrun of performance to date

D.

Cost for completed work is as per estimate

Buy Now
Questions 19

Status information, including program and component status, cost information, risk analysis and other relevant information, is provided in which of the following?

Options:

A.

Program performance report

B.

Communications management plan

C.

Communications log updates

D.

Information gathering and retrieval system

Buy Now
Questions 20

The program manager leads a medical billing system integration program for company A, a health services provider. Company A acquires smaller company X, which delivers health services strategically aligned with company A.

Company X uses a different billing approach than company A. Company A's chief information officer (CIO) seeks counsel on which solution would be the better option moving forward, requesting the program manager's assistance.

How should the program manager respond to the CIO's request?

Options:

A.

Document the resources required to implement the recommended solution and demonstrate how this solution will save the company money.

B.

Find similar examples of the preferred approach and ask the project teams to document why the preferred approach is better

C.

Gather the costs and benefits associated with each option and recommend the appropriate solution defining why the selected approach is better.

D.

Conduct a thorough stakeholder analysis and develop a program management plan to implement the appropriate solution for both companies.

Buy Now
Questions 21

Which of the following statements are true regarding program scope changes? (Choose three.)

Options:

A.

Scope changes may originate from the stake holders.

B.

Change requests for a particular project have to be approved by the project manager irrespective of their potential impact on multiple projects.

C.

The program has a change control board that analyzes changes at the program level.

D.

The change control process on a program is often hierarchical.

Buy Now
Questions 22

An R&D group director approves a major program’s charter. Although the director has a high level of understanding of the program’s scope, they are unsure of how the program manager can be successful in delivering the program’s commitments.

What should the program manager do to align stakeholders with planning and monitoring the program’s progress?

Options:

A.

Establish high-level program milestones

B.

Develop an accountability matrix, and assign program roles and responsibilities

C.

Generate a supplier management plan to identify external stakeholders

D.

Create a communications management plan, and establish reporting formats

Buy Now
Questions 23

Joan is the program manager for her organization. Management has asked her to create a centralized reporting system to capture information on program work, risks, changes, benefits management, and other aspects of the program. What solution can Joan implement to capture, communicate, and record the information management wants?

Options:

A.

Program management information system

B.

Program management integrated change control

C.

Change control systems

D.

Program management plan execution

Buy Now
Questions 24

You are the program manager of the GHY Program in your organization. It has come to your attention that some of the project managers in your program are adding time to each project activity in an effort to pad their durations in case some event happens in their project that will cause delays. What principle should you share with these project managers that counterattack the concept of padding activities with additional time?

Options:

A.

Parkinson's Law

B.

Law of Diminishing Returns

C.

80/20 Law

D.

Pareto's Law

Buy Now
Questions 25

A new component project is approved by the program governance board. The funding for this component project will be provided by an organization different from the organization funding the program.

Would this be an acceptable funding arrangement?

Options:

A.

Yes, only component projects may have different funding sources.

B.

Yes, the program and its components may have different funding sources.

C.

No, the program and the project must be funded by the same organization.

D.

No, component projects must be funded by program funds.

Buy Now
Questions 26

You are the program manager of the MQQ Program. Your program will use equipment and materials that are new to your industry. You have some concerns that there will be delays and waste by your program team because they've not worked with these materials or tools before. You elect to send the resources that will work the most with these tools through training. The cost of the training in this instance is known as which one of the following?

Options:

A.

Indirect costs

B.

Cost of doing business

C.

Direct costs

D.

Cost of conformance quality

Buy Now
Questions 27

You are the program manager of the HNG Program. This program has a budget at completion of $2,345,900 and is expected to last two years. The program is currently 30 percent complete and you have spent

$789,000. The program is supposed to be 35 percent complete but do to some delays you're slightly behind schedule. Based on this information, what is the schedule variance (SV) of this program?

Options:

A.

-$85,230

B.

$821,065

C.

-$284,100

D.

-$117,295

Buy Now
Questions 28

You are the program manager for your organization. Part of your role as the program manager is to train John, a new program manager, on the program processes within a program. John is confused as to when the program team can be acquired in the program management lifecycle. When will the program team be acquired for a program?

Options:

A.

Planning

B.

Execution

C.

Monitoring and controlling

D.

Initiation

Buy Now
Questions 29

Mary has just completed a large program for her organization. What should Mary now do with the program records that she has created throughout the program?

Options:

A.

The program records should be archived with the program customer.

B.

The program records should be archived with the program sponsor.

C.

The program records should be archived as part of organizational process assets.

D.

The program records should be archived as part of enterprise environmental factors.

Buy Now
Questions 30

A program has a budget at completion of $1,250,000 and has already spent $425,000. The program is running late due to some vendor delays; the program is only 30 percent complete though it was scheduled to be 45 percent at this time. Based on this information how much more money will this program need to finish?

Options:

A.

$978,445

B.

$919,325

C.

$991,667

D.

$987,544

Buy Now
Questions 31

The program manager plans to address a negative cost variance generating a red flag in the program management status report.

What should the program manager do?

Options:

A.

Contact the project sponsors to present the details, impacts, and possible corrective actions regarding the negative cost variance.

B.

Gather all the details, analyze impacts, determine corrective actions and present the findings to the governance board for direction.

C.

Work with program sponsor to compile impact analysis data to obtain additional funding for the program.

D.

Ask the program team to compile all details, analyze impacts, determine corrective actions and present to the governance board for direction.

Buy Now
Questions 32

You are the program manager for your organization and you need to define all of the program resources you'll need for your program. All of the following can be considered a program resource except for which one?

Options:

A.

A forklift

B.

Materials for the installation of a new server

C.

A positive risk response

D.

Gary, an application developer

Buy Now
Questions 33

A program governance board mandates that phase gate reviews must be held so each component project can be reviewed and individually authorized to proceed to the next phase. Tracking and reporting of actual benefits realized is one part of the review.

What is the other part of the review?

Options:

A.

Tracking and reporting on benefits management plan

B.

Identifying factors influencing delivery of benefits

C.

Demonstrating that other stage gate requirements have been met

D.

Gathering additional stakeholders' requirements

Buy Now
Questions 34

You are the program manager for your organization. This program will last for two years and has eight projects. The cost of your program is $4 million and there are some risk concerns that may affect the overall cost of the program. Management is concerned with how long it will take the program to reach the management horizon. What is management horizon also known as?

Options:

A.

Payback period

B.

Cost performance index

C.

Cost-to-benefits ratio

D.

Return on investment

Buy Now
Questions 35

You are the program manager for your organization and are planning the program. One of the plans you need to create will define how you'll transfer the benefits of the program to the operations of your organization. Which program management plan defines this process?

Options:

A.

Operational transfer plan

B.

Program transition plan

C.

Benefits transfer plan

D.

Program closure plan

Buy Now
Questions 36

You are the program manager for your organization. You are planning a new program that will construct a new warehouse facility for your company. As you look forward to the conclusion of the program you need an official document that will signify the program has ended. What document should you specify in your program management plan for the conclusion of the program?

Options:

A.

Final program audit report

B.

Audit of program financials

C.

Lessons learned documentation

D.

Certificate of program completion

Buy Now
Questions 37

Wanda is the program manager for her organization. Her program team consists of resources from across the organization - many of whom have not worked together before. Wanda thinks that she'll need to complete some team development but would like to focus the development on the materials and activities that the program team will need to complete in the program. What plan should Wanda reference and update to complete her team development process?

Options:

A.

Training plan

B.

Communications management plan

C.

Staffing management plan

D.

Requirements management plan

Buy Now
Questions 38

A program manager joins a team to fix a troubled enterprise-wide customer relationship management (CRM) system. Analysis indicates that duplicate customer information data is resulting in redundant client information. The program manager accesses the knowledge repository for similar programs to gather historical data and trends. A corrective action is identified, and a change in process is implemented to regain data integrity.

What should the program manager do with the knowledge gained from this activity?

Options:

A.

Include the lessons learned in the weekly program report

B.

Update the communications management plan

C.

Update the lessons learned database

D.

Communicate the corrective action to the program sponsor

Buy Now
Questions 39

A request for proposal (RFP) yields a bid with a better delivery schedule and a lower cost, but originates from a vendor not on the prequalified vendor list. During the final review of the RFPs, the program manager is informed that the new bidder is a relative of the project manager. Although the bid meets all company policies, the program manager is concerned about a conflict of interest.

What should the program manager do?

Options:

A.

Select the best bid from the prequalified vendor list.

B.

Accept the bid from the new vendor and document the decision.

C.

Advise the sponsor of a possible conflict of interest prior to awarding the bid.

D.

Add the new vendor to the prequalified list and replace the project manager.

Buy Now
Questions 40

Robert is the program manager of the NHQ Program. His team has never worked with one another before this program and he is worried about their abilities to become a team in very short order. He would like to create a team development exercise to facilitate this process. Robert will need all of the following information except for which one to facilitate team development?

Options:

A.

Risk management plan

B.

Program management plan

C.

Personnel records

D.

Training records

Buy Now
Questions 41

In your program you must adhere to Six Sigma as part of your organization's enterprise environmental factors. There is terminology, reports, and measurements that you are expected to use as part of your program. Six Sigma is an example of what program management process?

Options:

A.

Quality control

B.

Process improvement

C.

Scope verification

D.

Quality assurance

Buy Now
Questions 42

Part of your job as the program manager is to coach the project managers on their duties and goals. One of the project managers, Holly, is having trouble discerning the difference between quality assurance and quality control. She understands that she needs both to help you reach the program goals. Which statement best describes quality assurance for a project within your program?

Options:

A.

Quality assurance is an inspection-driven process to keep mistakes out of the project.

B.

Quality assurance is a prevention-driven process to keep mistakes out of the project.

C.

Quality assurance defines quality and sets goals for the project team.

D.

Quality assurance is an organization-wide process to do the work according the organizational goals and metrics.

Buy Now
Questions 43

You are the program manager for your organization. When a project in your program is completed, who will need to sign the certificate of completion?

Options:

A.

The project manager

B.

The program customer

C.

The program stakeholders

D.

The project management team

Buy Now
Questions 44

You are the program manager for your organization. Your program has a budget of $750,000 and is expected to last one year. The program is currently 30 percent complete and has spent $245,000. The program is supposed to be 40 percent at this time. What is the cost performance index for this program?

Options:

A.

.83

B.

-$20,000 C. .91

C.

Negative ten percent

Buy Now
Questions 45

Performing quality assurance in a program can result in which one of the following?

Options:

A.

Quality control execution

B.

Scope fulfillment

C.

Quality management plan

D.

Change requests

Buy Now
Questions 46

A new program is comprised of four component projects. The program manager must assign project managers to each of the four projects. There are eight potential project managers to consider.

What should the program manager do before assigning the project managers?

Options:

A.

Determine budgetary constraints related to the project managers’ salaries

B.

Request performance feedback from the project managers’ line managers

C.

Evaluate the project managers’ skills and match them to the needs of the projects

D.

Interview each project manager to determine their career aspirations

Buy Now
Questions 47

The program manager has a global program with five component projects. The program sponsor wants the management plans, processes/procedures, and technology to be uniform across the program. The requirements will create issues and result in increased costs The program sponsor is new and has imposed these new requirements six months into a three-year program.

What should the program manager do next?

Options:

A.

Accept what the program sponsor requires and implement the changes.

B.

Discuss the proposed changes with the stakeholders and project managers, and give the program sponsor the best option.

C.

Respond to the program sponsor if the program sponsor asks about it a second time.

D.

Present the risks and benefits of the changes to the program sponsor.

Buy Now
Questions 48

You are working with Sam, a project manager on one of the projects within your program. Sam doesn't understand all of the rules and procedures that he's required to do as a project manager in your program. What are the rules and procedures called in project that Sam must abide by?

Options:

A.

Project governance

B.

Process procedures

C.

Enterprise environmental factors

D.

Program governance

Buy Now
Questions 49

A software development program will launch iterative versions of new software called Alpha over two years. Following that, a program will be released to the program team and developers to create new software called Beta. While the program manager prepares the program closure plan for Alpha, the program sponsor expresses concern about its support after program closure.

What should the program manager do as part of Alpha’s program closure plan?

Options:

A.

Execute the transition plan, and include knowledge transfer to transition Alpha support to operations.

B.

Keep the Alpha program open until support is no longer required, then execute program closure.

C.

Adjust Alpha’s exit criteria to ensure its support is included in the Beta program.

D.

Document the program closure procedure to ensure that resources are released from Alpha to develop Beta.

Buy Now
Questions 50

A program has a BAC of $550,000 and is currently 45 percent complete though was actually scheduled to be 55 percent complete by this time. The program has spent, however, $265,000 to date. Based on this information what is the cost performance index (CPI) for this program?

Options:

A.

.93

B.

.82

C.

$323,889 D. -$38,889

Buy Now
Questions 51

Your program is to construct a new condo building in Chicago. You and the project managers are working together to define the project assumptions about the program. Which one of the following is an example of an assumption for this program?

Options:

A.

Deadlines for project milestones

B.

Building codes

C.

A predetermined program budget

D.

Weather

Buy Now
Questions 52

Tom is program manager for his organization. His program is scheduled to last ten months and has a cost estimate for the program of $550,000. It is now month nine and Tom reports that he actually has a cost variance of a positive $56,000. While Tom is pleased, the new management is not. Why is a positive cost variance not necessarily good news?

Options:

A.

A poor cost estimate prevented the organization from adding things to the program scope.

B.

Tom has overestimated the cost of the program.

C.

A poor cost estimate could affect the organization's decisions to invest the funds elsewhere .

D.

Tom has forgot to include deliverables in the program.

Buy Now
Questions 53

A program manager is working with the sponsor, stakeholders, and steering committee to formulate a program’s benefits sustainment and transition plan. What should the program manager do to create this plan?

Options:

A.

Identify key measures to compare expected benefits in the benefits management plan with actual performance once benefits sustainment and program transition starts.

B.

Assign creation of the benefits sustainment plan to the organization responsible for monitoring and controlling the sustainment period.

C.

Interview stakeholders, and revise the benefits management plan to provide new insight into the program’s execution and benefits sustainment period.

D.

Update the benefits management plan, and provide a copy to the organization responsible for measuring the sustainment period.

Buy Now
Questions 54

A newly appointed country manager suggests that the regional program manager use a social media platform to expedite communications and address QUESTION NO:s. The new country manager used this social media platform at a previous job.

What should the regional program manager do to address the country manager’s request?

Options:

A.

Suggest that the country manager use the existing communication channels while the team becomes familiar with the new social media platform.

B.

Ask the country manager to champion the social media platform, as they may have more influence than the regional program manager.

C.

Review existing in-house social media capabilities to determine if they will meet the needs of the country manager’s request, and update the stakeholder register.

D.

Ask the technology, security, and project teams to assess the country manager’s request.

Buy Now
Questions 55

In a transformational program, all projects are on track and delivering their objectives. However, stakeholders are hesitant to take on the new processes because performance in the current environment may not be representative of actual performance. Stakeholders fear that the program will fail to provide the service required.

To assure positive performance in the current environment, the program manager should do which of the following?

Options:

A.

Ensure the new processes will perform better than the current processes.

B.

Ask the program steering committee to endorse the new processes and current program schedule and deliverables.

C.

Meet with stakeholders to ensure they understand that the expectations for the new processes are superior to the current processes.

D.

Discuss concerns with stakeholders and mitigate them by changing the processes that will be delivered.

Buy Now
Questions 56

You are the program manager of HYH Program for your organization. Your program is to create a new sports arena for your city within 12 months. Your program has seven projects and you've worked with all of the project managers before. Even though you've worked with the project managers before you still need to define the authority of the project managers and their projects. What document names the project manager for the project?

Options:

A.

Project charter for each project

B.

Program human resource management plan

C.

Project scope statement

D.

Program management charter

Buy Now
Questions 57

You are a program manager of a program. You are required to compile performance data of your program. These data will be sent to relevant stakeholders. You are reviewing the status reports of all projects including the costs, schedule, scope, risks, and other performance data.

In which of the following processes are you working on?

Options:

A.

Plan Communication

B.

Distribute Information

C.

Report Program Performance

D.

Monitor and Control Program Performance

Buy Now
Questions 58

A small, regional utility closes a customer rewards program and transitions it to operations. The executive sponsor and program manager are concerned about the impact on benefits realization. The program manager assures the executive sponsor that any corrective actions will be included in the next phase.

What should the program manager do to ensure a successful transition?

Options:

A.

Ask each project manager to consolidate and file all program documentation in the corporate archives.

B.

Obtain all project manager’s contact information, and then have them reassigned back to their functional managers.

C.

Ask the program’s business analyst to collect all project information and create a report.

D.

Ensure that all program documents, including lessons learned, are archived in the knowledge repository.

Buy Now
Questions 59

A program with 10 components is in the planning phase. Project managers who oversee the component projects request detailed schedules. These schedules will be merged into one document to create a master schedule.

What should the program manager do to ensure that the overall program life cycle will meet stakeholder needs and deliver planned benefits?

Options:

A.

Establish a quality review for the project schedules to ensure that resource leveling and baselines are followed and component projects are delivered on time

B.

Work with the project managers to decompose their schedules to minimize risk and better understand the dependencies and resource needs

C.

Decompose the component schedules to determine if work can be executed more quickly to deliver value earlier than planned

D.

Create a work breakdown structure (WBS) to align program execution with stakeholder expectations and the benefits management plan

Buy Now
Questions 60

What is the present value of a program that will be worth $3,567,000 if it lasts for six years and the rate of return is five percent?

Options:

A.

$1,550,850

B.

$3,532,000

C.

$2,502,750

D.

$2,661,750

Buy Now
Questions 61

Mike is the program manager of the NHQ Program. Mike and a vendor are in disagreement over the deliverable the vendor has created for Mike's program. Mike does not believe the vendor has correctly created the deliverable, while the vendor is adamant that his company has indeed completed the contract. Both parties have documented their stance in the debate.

This is an example of what?

Options:

A.

Breach of contract

B.

Issue

C.

Risk

D.

Claim

Buy Now
Questions 62

You are trying to determine if you should buy or build a solution for your program. If you build the solution it'll cost you $45,000 to create and $7,000 per month to support. A vendor reports that they can create the solution for you for $1,000 but you'll have to pay them $9,000 per month to support the solution. Should you buy or build this solution?

Options:

A.

Build the solution if you'll use it longer than 22 months.

B.

Buy the solution if you'll use it longer than 24 months.

C.

Buy the solution if you'll use it longer than 22 months.

D.

Build the solution if you'll use it longer than 25 months.

Buy Now
Questions 63

You are the program manager of the YHT Program. You have been working with a vendor in the program but have decided that the contract between your program and the vendor needs to be terminated. What two things must be documented if you wish to terminate a vendor's contract?

Options:

A.

Contract and the quality measurements for the vendor's work

B.

The scope verification document and the termination notice

C.

Contract and scope verification process documents

D.

Work that has been completed and uncompleted work

Buy Now
Questions 64

Which of the following documents describes the details for each component in the WBS?

Options:

A.

WBS detail

B.

Risk register

C.

WBS dictionary

D.

Project charter

Buy Now
Questions 65

Joan is the program manager for her organization. Throughout the program life cycle there will be several elements, resources, and benefits that can be transitioned from her program to the organization. What document defines how these things can be transferred from the program to the organization?

Options:

A.

Operational transfer alliance plan

B.

Program milestone list

C.

Program transition agreement

D.

Program scope statement

Buy Now
Questions 66

A project manager in your program has estimated the cost of a program to be $145,000. As the project manager's project comes close to completion, the project manager realizes that he has still $27,876 left in his project budget. He decides to add some additional features to the project's deliverables in an effort to use the remaining budget. These additions will add value to the project and the project customer is likely to enjoy these new features. This is an example of what term?

Options:

A.

Gold plating

B.

Errors and omissions

C.

Expert judgment by the project manager

D.

Value added change

Buy Now
Questions 67

A software deployment program for a multinational organization requires the engagement of subcontractors. During the program planning phase, the contracts manager informs the program manager that the primary subcontractor's agreement includes incentives that would potentially conflict with program objectives.

What should the program manager do first?

Options:

A.

Review the contracts, and create a program budget contingency.

B.

Draft a change request for approval by the program steering committee.

C.

Ask the program management office (PMO) to conduct a risk assessment.

D.

Review the program charter, and update program objectives accordingly.

Buy Now
Exam Code: PgMP
Exam Name: Program Management Professional (PgMP)
Last Update: Jul 1, 2025
Questions: 452
PgMP pdf

PgMP PDF

$29.75  $84.99
PgMP Engine

PgMP Testing Engine

$35  $99.99
PgMP PDF + Engine

PgMP PDF + Testing Engine

$47.25  $134.99