Water Efficiency Prerequisite, Outdoor Water Use Reduction, Option 2. Reduced Irrigation, requires that a project's landscape water requirement be reduced by what percentage from the calculated baseline for the project site's peak watering month?
A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roofwith a minimum area of
Which of the following strategies is allowed under Energy Atmosphere Credit, Renewable Energy Production, and will help a project achieve Energy Atmosphere Credit, Optimize Energy Performance?
The contractor has submitted waste hauling reports for review in order to achieve Materials and Resources Credit, Construction and Demolition Waste Management. Which of the following materials on the documentation contribute towards the credit?
In pursuit of the Materials and Resources Credit, Building Disclosure and Optimization - Sourcing of Raw Materials,
Option 2. Leadership Extraction Practices, which of the following statements is true related to products purchased for
temporary use (formwork, bracing and scaffolding) on the project?
A neighborhood housing development organization has dual goals, promoting occupant's health and minimizing
energy costs. What LEED Building Design and Construction, New Construction credit might the LEED AP propose to best achieve the organization's dual goals?
Which of the following groups of documents is most likely to support both Indoor Environmental Quality Credit,
Thermal Comfort, and Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?
A project team compares a life-cycle assessment (LCA) model to a baseline design to determine the reductions in six impact categories. One impact category exceeds the baseline by 7%. Whichalternative analyses should the team run to check different impact measurements?
In order to meet the minimum qualifications for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification a Commissioning (Cx) agent must have completed the commissioning process activities for a minimum of how many similar projects?
What document allows a LEED AP to register a project and sign the Certification Agreement?
Which of the following Water Efficiency credits differ between LEED Building Design and Construction: New Construction and LEED Building Design and Construction: Healthcare?
A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building's location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility's project scope. The new building project needs to complete a new Phase I ESA if
If a commercial building is considered to have 100 peak visitors in a day, what is the minimum number of short-term
bicycle storage spaces that must be provided to earn one point under Location and Transportation Credit, Bicycle
Facilities?
For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum amount of time that the metering system should store data?
The project team has decided to substitute the flooring in the school gym with natural rubber flooring that has met the Sustainable Agriculture Standard. The cost of the substituted flooring is $80,000. The project will achieve
The total land area within a 1/4 mi. (0.40 km) radius of a project boundary consists of 130 acres (53 hectares) andhas a residential to nonresidential ratio of 60:40. Within this same total land area, there are 780 dwelling units and1,600,000 ft2 (148 645 m2) of nonresidential building space. Given these parameters, what are the surroundingresidential and nonresidential densities when attempting to achieve Location and Transportation Credit,Surrounding Density and Diverse Uses?
Which of these is a method to assess the regional context of a building's design for sustainability?
A LEED Building Design and Construction project includes an outdoor stage for theatrical performances. In pursuit of Sustainable Sites Credit, Light Pollution Reduction the engineer has specified an LED fixture to illuminate actors on the stage while limiting light pollution. Which of the following suggestions should the LEED AP give to the project owner?
What percentage of a building's surface area may be excluded from the calculation for Materials and ResourcesCredit, Building Life-Cycle Impact Reduction, Option 2. Renovation of Abandoned or Blighted Buildings because ofdeterioration or damage when maintaining existing building structure, enclosure and interior structural elements?
Which system is eligible for the Energy and Atmosphere Credit, Renewable Energy Production?
When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following information is required to be present in the Owner's Project Requirements (OPR)?
Which of the following prerequisites or credits are affected by using plug-in devices when attempting to achieve Indoor Environmental Quality Credit. Thermal Comfort?
Which views would qualify as a quality view for Indoor Environmental Quality Credit, Quality Views?
The LEED AP has identified a pilot credit that is relevant to the project. This would be documented in LEED Online as a(n)
A decorative overhead light fixture is specified for a project that costs $1,500 USD and uses recycled water bottles as part of the diffuser shade. The shades are 10% of the overall weight of the fixture and are 50% post-consumer recycled content. Assuming no other portions of the fixture meet sustainability criteria, what would the contributing value of the fixture be?
What LEED Building Design and Construction project type should exclude weekend transit service from the transit service level calculations for Location and Transportation Credit, Access to Quality Transit, if the project occupants do not commute to the building during weekends?
A contractor wants to use an adhesive that exceeds the allowed Volatile Organic Compound (VOC) content limit under Indoor Environmental Quality Credit, Low Emitting Materials. This credit canbe earned if
A rectangular office building is located in an extremely humid climate and is shaded by very large adjacent buildings
on all four sides. If the building owner wants to decrease the annual energy cost for operating the building, which of
the following would be the best design approach?
A commercial new construction project consists of mixed space usage. When deciding which LEED rating system to use, the LEED AP should follow which of the following rules?
Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to exclude what type of land area from the calculations?
Increasing which of the following variables will require an increase in the outdoor airflow rate under Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?
Massing and orientation in Integrative Process Credit. Integrative Process evaluates how rotating the building 90 degrees affects
How is the distance between the project site and the manufacturing location determined for Materials and Resources Credit. Building Disclosure and Optimization - Sourcing of Raw Materials. Option 2. Leadership Extraction Practices?
To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate
What is the average flush rate for a dual flush toilet with a high flush rate of 1.6 gpf (6 lpf) and a low flush rate of 1.05 gpf (4 lpf)?
A project attempting to meet the preferred parking requirements for Location and Transportation Credit, Green Vehicles may provide what incentive to meet the requirements and highlight the project sustainable vehicle strategy?
Which rating system is being used if all of the credits below have been submitted towards certification?
- Location and Transportation Credit, Reduced Parking Footprint
- Energy and Atmosphere Credit, Fundamental Refrigerant Management
- Indoor Environmental Quality Credit, Acoustic Performance
- Materials and Resources Credit, Persistent, Bio accumulative, and Toxic (PBT) Source Reduction - Lead,Cadmium, and Copper
In a large industrial or commercial building, which energy end uses are classified as systems composed of discrete pieces of equipment that can be metered together for the purposes of Energy and Atmosphere Credit, Advanced Energy Metering?
The use of lead, mercury, copper and cadmium should be limited because they all
When working on a renovation project, asbestos containing materials have been found on the perimeter walls. When calculating the percentage of building being reused under the Materials and Resources Credit, Building Life-Cycle Impact Reduction, the materials remediated will be
Which principal areas must the LEED AP focus on to attain the Integrative Process Credit, Integrative Process?
The required minimum scope of analysis for a product-specific declaration that contributes toward Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations, Option 1. Environmental Product Declaration is
A building owner is considering the installation of a solar thermal panel on the roof of the building. The initial cost of the system is higher than a conventional natural gas system. Which of the following is true to make the renewable energy option economically feasible?
For a task chair purchased for a healthcare facility, which portion of the product contributes toward Materials and Resources Credit, Furniture and Medical Furnishings?
The LEED AP is leading the first design charrette for a new LEED project with the project's owners. What document
should be used to record the project goals to be used throughout the design of the project?
Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water budget and irrigation water demand early in the design process in Water Efficiency Prerequisite, Outdoor Water Use Reduction project teams will be able to
The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4.
Whole-Building Life-Cycle Assessment is a
A design team is working on a hospital project. In order to meet the Energy and Atmosphere Prerequisite, Minimum
Energy Performance, what option is used?
A project team has installed a rainwater harvesting system on site. In which of the following could this system be recognized?
The LEED project has a main entrance and two service entrances in an alley behind the building. Which entrances need non-smoking signage and at what maximum distance from the door(s) can the non-smoking signage be posted?
Plug-in task lighting will be utilized in a LEED project at all workstations. The task lighting is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance since
Which would contribute to compliance with Sustainable Sites Credit, Open Space?
A design team is pursuing Indoor Environmental Quality Credit, Indoor Air Quality Assessment. The building is 1,000 ft2 (93 m2) and has a 10 ft. (3 m) ceiling height. In order to earn the credit, what is the required volume of
supply air for the entire building flush-out?
Which of the following documents contains the design team's interpretation of the Owner's Project Requirements?
Which rating system is appropriate for a new mixed-use building with 300,000 ft2 (27 871 m2) of residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space?
Which of the following would be most useful to a school project that is attempting to pursue Water Efficiency Credit, Indoor Water Use Reduction?
What is the maximum number of points a project pursuing LEED for New Construction can achieve under Location
and Transportation Credit, Access to Quality Transit?
A school wants to incorporate natural daylighting in classrooms on all sides of the building. What can the project design team explain to the school district about how this strategy will affect the operational energy cost?
What supporting material is required for all LEED Building Design and Construction projects in order to document Location and Transportation Credit, Bicycle Facilities for the bicycle network?
The Sustainable Sites Credit, Heat Island Reduction takes into account both new and three-year aged Solar Reflectance Index (SRI) values for roofing material because
The intent of the Sustainable Sites Prerequisite. Construction Activity Pollution Prevention is to £