Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: geek65

NCP-MCI-6.10 Nutanix Certified Professional - Multicloud Infrastructure (NCP-MCI v6.10) Questions and Answers

Questions 4

Refer to Exhibit:

In ascale-out Prism Central deployment, what additional functionality does configuring anFQDN instead of a Virtual IPprovide?

Options:

A.

Load balancing

B.

Resiliency

C.

Segmentation

D.

SSL Certificate

Buy Now
Questions 5

In anRF2 cluster, what is theminimum number of nodes requiredto allow ahost removal?

Options:

A.

2

B.

3

C.

4

D.

5

Buy Now
Questions 6

An administrator is responsible forresource planningand needs to plan forresiliencyof a10-node RF3 cluster. The cluster has100TB of storage.

How should the administrator plan for capacity in the event of future failures?

Options:

A.

Set Reserve Storage Capacity (%) to 20.

B.

Set Reserve Capacity for Failure to None.

C.

Set Reserve Capacity for Failure to Auto Detect.

D.

Set Reserve Memory Capacity (%) to 20.

Buy Now
Questions 7

A security team asks an administrator toset up port mirroringof aspecific source VMto atarget VM.

What must the administrator ensure for this configuration to be possible?

Options:

A.

Source VM and Target VM are on the same VLAN.

B.

Source VM and Target VM are on the same host.

C.

Source VM and Target VM are on the same subnet.

D.

Source VM and Target VM are on the same VPC.

Buy Now
Questions 8

How can an administrator create a custom Intelligent Operations report, and run across multiple Prism Central instances?

Options:

A.

When creating the report, select the other Prism Central instances.

B.

Export/import the report configuration in .rpt format.

C.

Configure report sharing between Prism Central instances.

D.

Manually recreate the report in each Prism Central instance

Buy Now
Questions 9

Which two actions occur by default on a node that is placed inMaintenance Mode? (Choose two.)

Options:

A.

Non-migratable VMs are powered off and restarted on other hosts in the cluster.

B.

All eligible VMs on the host are migrated to other hosts in the cluster.

C.

All eligible VMs on the host are powered off.

D.

Non-migratable VMs are powered off.

Buy Now
Questions 10

An administrator needs to create astorage containernamed TestData with the following conditions:

    Replication Factor (RF) = 1 (RF1)

    Inline Compression enabled

    Deduplication disabled

    Maximum storage capacity = 100 GiB

How should the administrator complete this task?

Options:

A.

Log intoPrism Elementand create the storage container with anAdvertised Capacity of 100 GiB.

B.

Log intoPrism Elementand create the storage container.

C.

Log intoPrism Centraland create the storage container with aReserved Capacity of 100 GiB.

D.

Log intoPrism Centraland create the storage container.

Buy Now
Questions 11

An administrator is planning for an upcoming maintenance window. The administrator would like to minimize the chance of an upgrade failure during the maintenance window to ensure the updates will complete without issue.

What action should the administrator take to reduce the risk of any potential failures during an upgrade?

Options:

A.

Upgrade AOS to the latest version from LCM.

B.

Run an Upgrade Precheck from LCM.

C.

Reboot each CVM one-at-a-time to ensure the reboots are successful.

D.

Reboot each host one-at-a-time to ensure the reboots are successful.

Buy Now
Questions 12

An administrator has configured Metro Availability but a few hours later got an NCC warning:

Node x.x.X.X:

WARN: Break replication timeout of Metro protection domain 'M1' is below the recommended minimum.

What is a possible resolution for this issue?

Options:

A.

Update the break_replication_timeout to 10 seconds.

B.

Update the break_replication_timeout to 5 milliseconds.

C.

Update the break_replication_timeout to 15 milliseconds.

D.

Update the break_replication_timeout to 15 seconds

Buy Now
Questions 13

An administrator has deployed two Nutanix clusters and is now establishing synchronous replication between them. However, the replication is failing immediately.

Which two responses show the reason and corrective action an administrator can take to resolve the issue? (Choose two.)

Options:

A.

If the primary and the recovery clusters are in different subnets, open the ports manually for communication.

B.

If the primary and the recovery clusters are on the same subnet, open the ports manually for communication.

C.

Use the command modify_firewall to open the ports on eth1 interface.

D.

Use the command modify_firewall to open the ports on eth0 interface

Buy Now
Questions 14

An administrator needs to perform anLCM upgradeon anAHV host with GPUs.

What additional step is required before upgrading the host?

Options:

A.

Create an agent VM on each host that has GPU drivers installed.

B.

Run LCM in dark site mode so it can update AHV independently.

C.

Use Direct Uploads to upload appropriate driver bundles.

D.

Update NCC to the latest version and re-run Inventory.

Buy Now
Questions 15

An administrator needs tooptimize a VM’s storageby leveragingcompression features. The VM’svDisksare currently stored in adefault storage containerwithno optimizations enabled.

How should the administrator proceed?

Options:

A.

Migrate vDisks to the Production storage container.

B.

Recreate the VM in the Production storage container and copy data.

C.

Migrate the VM to the Production storage container.

D.

Recreate the vDisk in the Production storage container and copy data.

Buy Now
Questions 16

An administrator is configuringProtection Policiesto replicate VMs to aNutanix Cloud Cluster (NC2)over the internet.

To comply with security policies, how should data be protected during transmission?

Options:

A.

Configure Data on a self-encrypting drive.

B.

Configure VMs to use UEFI Secure Boot.

C.

Enable Data-at-Rest Encryption.

D.

Enable Data-in-Transit Encryption.

Buy Now
Questions 17

Due to application requirements, an administrator needs to modify an AHV VM in order to support a large number of distinct, concurrent connections. The VM has the following configuration:

• VCPUs: 4

• RAM: 20 GB

Operating System: Microsoft Windows Server 2022

Which modification can the administrator make to improve network performance for network I/O-intensive applications running on this VM?

Options:

A.

Enabling RSS Virtio-Net Multi-Queue

B.

Adding more VCPUs

C.

Adding more RAM

D.

Enabling AHV Turbo Technology

Buy Now
Questions 18

An administrator is working with anetwork engineerto design thenetwork architecture for a DR failover.

BecauseDNS is well-designed, theDR site will use a different subnetbutretain the same last octetin the IP address.

What is the best way to achieve this?

Options:

A.

Use a custom script to update the IP address after instantiation in DR.

B.

Set up IPAM so the address is dynamically assigned during DR.

C.

Manually log into VMs after the DR event and update the last octet.

D.

Utilize Recovery Plan Offset-based IP mapping.

Buy Now
Questions 19

A cluster has an RF3 storage container with many VMs. Before the cluster runs out of space, the administrator has created a new RF2 storage container and would like to live migrate the vDisks.

Which check should be done before performing vDisk migration?

Options:

A.

Validate network latency is below 5 milliseconds.

B.

Remove VMs from Protection Domains or Protection Policies.

C.

Verify Multichannel Support is enabled.

D.

Ensure storage optimization options match between storage containers

Buy Now
Questions 20

How can a VM or Volume Group (VG) be associated with a Storage Policy?

Options:

A.

Assign the Storage Policy directly on the VM or VG.

B.

Assign the VM or VG directly to the Storage Policy.

C.

Migrate the VM or VG to the Storage Container assigned to the Storage Policy.

D.

Assign the VM or VG to the same Category as the Storage Policy.

Buy Now
Questions 21

Whichtwo URLs must be accessiblefrom aConnected Site’s Controller VMsto allowLife Cycle Manager (LCM) to download software updates?

Options:

A.

download.nutanix.com

B.

mynutanix.com

C.

release-api.nutanix.com

D.

portal.nutanix.com

Buy Now
Questions 22

Refer to Exhibit:

An administrator is looking at thememory cluster runway diagramas shown in exhibit, in Prism Central. The environment hasthree hostswith the following configuration:

    CPU: 2x Intel Xeon Gold (8 cores, 2.6 GHz)

    RAM: 256 GB per host

    Storage: SSDs and HDDs

TheIntelligent Operations featurehas been active forone month, but no further configurations were applied.

What does the dotted red line mean?

Options:

A.

It is thedefault trend analysis static thresholdthat can be manually set.

B.

It is themaximum memory the administrator can assign to VMs.

C.

It is thecalculated memory oversubscription limitfor currently running VMs.

D.

It is theusable capacity based on cluster configuration options.

Buy Now
Questions 23

An administrator is managing a4-node clusterwithdifferent hardware generations:

    Two G5 Nodes→ 2 CPUs (12 cores), 1 SSD (1.92 TB), 2 HDDs (4 TB).

    Two G7 Nodes→ 2 CPUs (16 cores), 2 SSDs (1.92 TB), 4 HDDs (4 TB).

The cluster will bedecommissioned from productionand used forDisaster Recovery (DR) purposeswithan RPO of 1 hour.

What is the best approach when replacing G5 nodes without impacting performance?

Options:

A.

New node must have at least 2 SSDs.

B.

New node must be G7 or G8.

C.

New node must have 2 CPUs with 12 cores.

D.

New node must be hybrid.

Buy Now
Questions 24

Which two entities can be categorized? (Choose two.)

Options:

A.

Storage Containers

B.

Alerts

C.

Virtual Machines

D.

ISO Images

Buy Now
Questions 25

An administrator is tasked with optimizing a VM's storage to leverage compression features. Currently, vDisks are in a storage container default-container-91753272703541 that has no optimization activated. The administrator must move the VM's storage to the storage container Production.

What is the most efficient way to achieve this operation?

Options:

A.

Recreate VM in the Production storage container configuration and copy data.

B.

Recreate vDisk in the Production storage container configuration and copy data.

C.

Migrate VM to the Production storage container.

D.

Migrate vDisks to the Production storage container.

Buy Now
Questions 26

An administrator is preparing for afirmware upgradeon a host and wants to manuallymigrate VMs before executing the LCM upgrade. However,one VM is unable to migratewhile others migrate successfully.

Which action would fix the issue?

Options:

A.

EnableAcropolis Dynamic Scheduling (ADS)at the cluster level.

B.

UpdateLink Layer Discovery Protocol (LLDP).

C.

DisableAgent VMwithin the VM configuration options.

D.

Configurebackplane port groupsthat are assigned to the CVM.

Buy Now
Questions 27

If an administratorcreates a report with no retention policy configured, how many instances of the report areretained by default?

Options:

A.

5

B.

10

C.

15

D.

20

Buy Now
Questions 28

An administrator receives analert in Prismstating:

"Storage container on cluster will run out of storage resources in approximately 1 day."

However, the cluster hasplenty of available space remaining.

What configuration setting is causing the container to run out of space while the cluster has space remaining?

Options:

A.

Advertised Capacity is set too low.

B.

Reserved Capacity is set too high.

C.

Compression is set too low.

D.

Replication Factor is set too high.

Buy Now
Questions 29

An administrator has configuredAHV Metro Availability with Witnessand is testing failover scenarios.

During testing, the administratordisconnects the primary and recovery clustersbutPrism Central remains connected to the recovery site.

What are two expected system behaviors? (Choose two.)

Options:

A.

Guest VM I/O operations pause (freeze) until connectivity is restored.

B.

Guest VM I/O operations pause (freeze) until connectivity between Prism Central and the primary site is restored.

C.

Guest VMs failover automatically to the recovery cluster.

D.

Guest VMs continue to run on the primary cluster.

Buy Now
Questions 30

Per organizational requirements, an administrator has uploaded a signed SSL certificate to Prism for Common Access Card (CAC) authentication.

Once the certificate has been uploaded successfully, the certificate appears to be valid but CAC authentication is not functional.

What is a potential cause of this problem?

Options:

A.

There is no Certificate Revocation List (CRL) configured.

B.

RSA key size is incorrect.

C.

Online Certificate Status Protocol (OCSP) is not enabled.

D.

Signature Algorithm is incorrect.

Buy Now
Questions 31

Which predefined view should be leveraged in Prism Central Intelligent Operations to determine which VM is consuming too many resources and causing other VMs to starve?

Options:

A.

Constrained VMs List

B.

Bully VMs List

C.

Inactive VMs List

D.

Overprovisioned VMs List

Buy Now
Questions 32

Upon reaching the maximum instances of retained reports, what occurs?

Options:

A.

New reporting is delayed.

B.

Reporting failure is reported.

C.

Manual deletion is required.

D.

Oldest report is deleted

Buy Now
Questions 33

Refer to the Exhibit:

An administrator needs to create two virtual machines: VM4 and VM5 that leverage the memory over-commit feature.

Once VM4 is created and running, the administrator notices that it uses only 28GB of RAM.

What will be the maximum RAM that can be allocated to VM5 so that it can be powered on?

Options:

A.

4GB

B.

8GB

C.

16GB

D.

32GB

Buy Now
Questions 34

An administratorwants to ensure that VMscan bemigrated and restarted on another nodein the event of asingle-host failure.

What action should be taken in Prism Element to meet this requirement?

Options:

A.

SetRedundancy Factor to 3.

B.

EnableHA Reservation.

C.

Configure aProtection Domain.

D.

Configure anRF1 storage container.

Buy Now
Questions 35

An administrator needs to configureNTPonPrism Central running on a Hyper-V cluster.

How should the administrator complete this task?

Options:

A.

Add anexternal NTP server.

B.

Add theDNS server IP.

C.

Add aserver with a DNS hostname.

D.

Add theIP of the Domain Controller.

Buy Now
Exam Code: NCP-MCI-6.10
Exam Name: Nutanix Certified Professional - Multicloud Infrastructure (NCP-MCI v6.10)
Last Update: Jun 15, 2025
Questions: 119
NCP-MCI-6.10 pdf

NCP-MCI-6.10 PDF

$29.75  $84.99
NCP-MCI-6.10 Engine

NCP-MCI-6.10 Testing Engine

$35  $99.99
NCP-MCI-6.10 PDF + Engine

NCP-MCI-6.10 PDF + Testing Engine

$47.25  $134.99