Labour Day Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: geek65

NCM-MCI-5.20 Nutanix Certified Master - Multicloud Infrastructure (NCM-MCI) 5.20 Questions and Answers

Questions 4

An administrator has a 4-node Nutanix cluster running on AHV. The administrator creates

a new storage container and makes that all available to all hosts.

Which storage protocol is used for Virtual Machines to access virtual disks on the storage container?

Options:

A.

NFS

B.

Fiber Channel

C.

iSCSI

D.

SMB/CIFS

Buy Now
Questions 5

An administrator has Created a new windows VM and Given it to the user. The user states that only C drive mapping is visible within the windows OS.

What is causing this issue?

Options:

A.

The user has not formatted and assigned drive letters to the additional disk.

B.

The additional disk have not been formatted as ExFAT in Prism Central

C.

the administrator has not run the add command line utility

D.

the additional disk were formatted as NTFS in Prism Central

Buy Now
Questions 6

An administrator deletes a large amount of data from a Volume Group presented to a Linux VM. The administrator notices that the deleted data has not been reclaimed as usable storage.

What action should be taken to reclaim the storage capacity?

Options:

A.

Shrink the Volume Group that is associated with the Linux VM

B.

Unmount the Volume Group and then Remount the Volume Group

C.

Enable the unman operation on the Linux VM

D.

Run Defrag on the Linux VM

Buy Now
Questions 7

A customer recently set up Async Replication between Site A and Site B. The customer wants to conduct a planned failover and clicks Activate on Site B.

The customer then runs the following command on Site A:

ncli pd deactivate_and__destroy_vms name=

What does this do to the customer environment?

Options:

A.

VMs get deleted from Site B. and the protection domain is now Active.

B.

VMs are powered off on Site A and must be manually powered on at Site B.

C.

VMs get deleted from Site A and the protection domain is no longer active.

D.

Customer must then manually power off VMs at Site A and power them on at Site B.

Buy Now
Questions 8

Refer to the exhibit.

An administrator logs in to Prism and sees the status shown in the exhibit within the Hardware Diagram section.

What should the administrator do?

Options:

A.

Resolve all alerts and re-import the disks to make sure there is no service disruption.

B.

Restart all CVMs for the cluster to check, confirm health and repartition and add the disks.

C.

Reseat all disks immediately. If this does not help, reseat the nodes.

D.

Check status of applications running on the cluster and call support

Buy Now
Questions 9

A CEO asks the IT administrator to provide a list of required resources to protect current workloads and the two new SQL servers from a disaster. The Nutanix environment is managed by Prism Central.

Which option explains how to meet the CEO's request?

Options:

A.

In Capacity Runway, select Optimize Resources and select all VMs that must be protected.

B.

Create a new project and assign the VMs to it to get compute and storage requirements.

C.

Create a new scenario based on a new cluster based on a VM Profile and select Recommend.

D.

Create a new Recovery policy by selecting the VM that needs to be protected and get hardware requirements.

Buy Now
Questions 10

An administrator has a VM that consumes large amounts of storage and has the following characteristics:

• Create large / sequential writes

• Data must be kept for years

• Data is normally only accessed at the end of the year to run report

The administrator decides to use Erasure Coding to save space.

Which feature should the administrator utilize to save space for this VM?

Options:

A.

Inline Compression

B.

Flash Mode

C.

Cache Dedup

D.

Post-Process Compression

Buy Now
Questions 11

A company needs to replicate their VMs to a remote site and must have an RPO of less than 1 hour.

When creating a protection domain, what should an administrator do to meet this requirement?

Options:

A.

Enable Async Replication with an RPO of 60 minutes

B.

Enable Near-Sync Replication with an RPO of 15 minutes

C.

Enable Entity Sync on the designated VMs

D.

Enable Availability Zones and send the VM to multiple targets

Buy Now
Questions 12

An administrator needs to create and start five new VMs for a Data Analytics Project (OLAP). The VM Profile is as follows:

• vCPU:4

• vRAM: 64 GB

• vDisk: 1.5 TB

Each of the four nodes of the Nutanix cluster has the following:

• 24 vCPU. 20% overall usage

• 192 GB RAM, 60% overall usage

• 2xl920GBSSD

• 4x 2 TB HDD

At cluster level, there is a single RF2 container that is 30% utilized and has an extent store capacity of 13.5 TB.

Which component requires administrator attention?

Options:

A.

Physical RAM, because it is not enough to power on all of the new VMs.

B.

Physical Cores, because they are not enough to power on all of the new VMs.

C.

Storage, because the capacity is not enough to create VMs.

D.

Flash Tier because it is not enough to accommodate the workloads.

Buy Now
Questions 13

An organization is running a Nutanix Cluster based on AOS 5.10.x and VMware vSphere 6.7. Currently, the CVM network is segmented and Storage only nodes not present.

A new security project based on NSX is coming. VMware Distributed Virtual Switches are required. The administrator needs to prepare the environment for the new project.

Which step should the administrator use to initiate the project?

Options:

A.

Enable Nutanix Flow at the Prism Central Level

B.

Manually disable CVM network Segmentation

C.

Convert storage only nodes into vSphere nodes

D.

Enable Jumbo Frames to accommodate network frames

Buy Now
Questions 14

A system administrator needs to shut down an AHV node in a Nutanix cluster without causing service disruption. The administrator checks data resiliency and verifies that the cluster can tolerate a node down.

Which three steps should the administrator perform next? (Choose three.)

Options:

Buy Now
Questions 15

An administrator has two clusters: Site A and Site B.

Async DR is configured between the clusters as follows:

• Site A is the Primary Site

• Site B is the Secondary inactive Site, no VMs running

• Site A is fully in Production

• Site B used as Backup/Disaster Recovery

The customer wants to perform a planned failover between the sites.

How should the administrator accomplish this?

Options:

A.

Click Activate on the Secondary site within the Data Protection Dashboard

B.

Click Activate on the Secondary site and run deactive NCLI command on Primary site

C.

Choose Migrate on the Secondary site within the Data Protection Dashboard

D.

Choose Migrate on the Primary site within the Data Protection Dashboard

Buy Now
Questions 16

An administrator recently installed Prism Central to use categories, after having created categories and values, the administrator needs to apply these categories to multiple workloads.

How can the administrator easily perform this task?

Options:

A.

Go to Categories and select the VMs to be added

B.

Create a Playbook to automate the process

C.

Manage the VMs ownership

D.

Choose multiple VMs and select Manage Categories

Buy Now
Questions 17

How should an administrator enable the recycle bin on a nutanix cluster?

Options:

A.

Select the Enable Recycle Bin checkbox on the storage Overview page

B.

select Retain Deleted VMs for 8h in the cluster Details Page of the cluster setting

C.

Select the enable recycle bin checkbox in the configure CVM page of the cluster setting

D.

Select Retain Deleted VMs for 24h in the cluster details page of the cluster setting

Buy Now
Questions 18

An administrator needs to make sure an RF2 cluster can survive a complete rack failure without negatively effecting workload performance. The current cluster configuration consists of the following:

• 30 nodes: distributed 10 nodes per rack across three 42U rack

• Each nodes is configured with 40TB usable storage all flash (Cluster Total 1.2 PB Usable)

• Current cluster utilization is 900TB storage

Which configuration changes should be made to make sure that the cluster meets the requirements?

Options:

A.

Expanse the cluster by adding 3 additional nodes per rack, 9 nodes total.

B.

Expanse the cluster by adding 2 additional nodes per rack, 6 nodes total.

C.

Expanse the cluster by adding 9 nodes to a new 42U rack

D.

Expanse the cluster by adding 8 nodes to a new 42U rack

Buy Now
Questions 19

An administrator needs to take a single node down for maintenance. Which two steps should the administrator take? (Choose two)

Options:

A.

Make sure Auto Evacuation is enabled

B.

Shut down or live migrate all VMs off of the node.

C.

Verify the data resiliency status of the cluster.

D.

Reclaim the licenses to the Nutanix Support Portal.

Buy Now
Questions 20

Refer to the exhibit.

User 1 and User 2 belong to the AAPM group

What are two descriptions of how Files perform quota management? (Choose two.)

Options:

A.

User 2 can continue to add another 3GB file but will receive a daily notification email.

B.

User 1 can continue to add another 5GB file but will receive a daily notification email.

C.

User 1 can add an 8GB file to the share without receiving notification.

D.

User 2 can add an 8GB file without receiving a notification email.

Buy Now
Questions 21

An administrator recently added VLAN 205 CRM in Prism Element. The workloads attached to the associated NICs are unable to establish network connectivity.

Which Layer 2 protocol allows the administrator to troubleshoot this issue from Prism Element?

Options:

A.

HDLC

B.

SUP

C.

LACP

D.

LLDP

Buy Now
Questions 22

A customer has a primary datacenter with 12 Nutanix blocks distributed across three racks. The customer wants to achieve the most resiliency possible. They also have a datacenter in a branch office that is 400 kilometers away from the primary datacenter.

Which two solutions should be used? (Choose two.)

Options:

A.

Time Stream to a remote site

B.

Async DR to a remote site

C.

Rack awareness

D.

Block awareness

Buy Now
Questions 23

Refer to the exhibit.

After performing ESXi to AHV conversion on a cluster, the alerts shown in the exhibit display on Prism. What should the administrator do to resolve this issue efficiently?

Options:

A.

Remove the VMs. create a new Protection Domain, and add VMs to it

B.

Remove VMs from the Protection Domain and add them back in.

C.

Delete the Protection Domain, create a new Protection Domain, and add the VMs to it

D.

Create a new Protection Domain and add the VMs to rt.

Buy Now
Questions 24

An organizations Nutanix Cluster is based on VMware vSphere. The cluster is configured to download software updates automatically. The administration needs to verify and eventually upgrade VMware hypervisor via Prism Ul.

After logging in to Prism, the administrator receives the message shown:

No available versions for upgrade

What is causing the current state?

Options:

A.

VMware support has expired, so downloads are not available.

B.

vSphere binaries need to be manually uploaded.

C.

The environment is running the latest vSphere version, so no update is required.

D.

The cluster is unable to connect to reIease-api.nutanix-ccm:8D.

Buy Now
Questions 25

What are two types of Protection Domains that Nutanix Offers for data Protection? Choose Two

Options:

A.

Consistency Group

B.

Snapshot

C.

Metro Availability

D.

Async DR

Buy Now
Exam Code: NCM-MCI-5.20
Exam Name: Nutanix Certified Master - Multicloud Infrastructure (NCM-MCI) 5.20
Last Update: Apr 23, 2024
Questions: 167
NCM-MCI-5.20 pdf

NCM-MCI-5.20 PDF

$28  $80
NCM-MCI-5.20 Engine

NCM-MCI-5.20 Testing Engine

$33.25  $95
NCM-MCI-5.20 PDF + Engine

NCM-MCI-5.20 PDF + Testing Engine

$45.5  $130