M2 Commercial Mechanical Inspector Questions and Answers

Questions 4

Ducts shall not be permitted to be connected to:

Options:

A.

an evaporative cooler.

B.

a vented wall furnace.

C.

a gravity-type warm-air furnace.

D.

a high-static-pressure-type unit heater.

Buy Now
Questions 5

Exhibit:

CEF-5 is a ceiling exhaust fan manufactured by:

Options:

A.

G.E.

B.

Carnes

C.

Markel

D.

Nutone

Buy Now
Questions 6

Horizontal terminations for mechanical draft systems that are adjacent to public walkways shall be located a minimum of _____ feet above grade.

Options:

A.

7

B.

8

C.

9

D.

10

Buy Now
Questions 7

Given: Fabricated of type 430 stainless steel.

Optional type _____ stainless steel is available.

Options:

A.

301

B.

303

C.

304

D.

316

Buy Now
Questions 8

Given: The listed clearance is 12 inches.

What would be the reduced clearance to combustibles, in inches, if the millboard is replaced with 24-gauge sheet metal?

Options:

A.

2

B.

4

C.

6

D.

3

Buy Now
Questions 9

What is the minimum air velocity that must be provided by an exhaust duct system serving a Type I range hood?

Options:

A.

500 FPM

B.

500 CFM

C.

1,500 FPM

D.

2,500 FPM

Buy Now
Questions 10

The exhaust outlet for a clothes dryer is required to be equipped with:

Options:

A.

a backdraft damper.

B.

an automatically controlled volume damper.

C.

a corrosion-resistant screen of 1/4-inch mesh.

D.

a temperature limit control device that will automatically shut off the system at a temperature of 250°F.

Buy Now
Questions 11

When a permit is issued, the code requires that one set of approved plans and specifications be returned to the applicant.

This set of plans and specifications shall be:

Options:

A.

kept on the building site.

B.

returned to the architect.

C.

filed with the county clerk or jurisdiction to properly record the property.

D.

retained by the applicant for at least one year after the job is finished in the event modifications are made.

Buy Now
Questions 12

To test for tightness, a consumer’s gas piping should never be filled with:

Options:

A.

air.

B.

dry air.

C.

oxygen.

D.

inert gas.

Buy Now
Questions 13

A low-pressure steam heating boiler is a boiler furnishing a maximum steam pressure of _____ psi.

Options:

A.

[option text not fully visible in the material you sent]

B.

15

C.

[option text not fully visible in the material you sent]

D.

80

Buy Now
Questions 14

Termination of vents for appliances listed for and installed outdoors that incorporate integral venting shall:

Options:

A.

terminate not less than 5 feet vertically above the lowest connected appliance draft hood outlet or flue collar.

B.

terminate not less than 5 feet vertically above the highest connected appliance draft hood outlet or flue collar.

C.

be installed in accordance with their listings and the manufacturer’s installation instructions.

D.

be installed in accordance with the design professional’s plans as approved by the local building official.

Buy Now
Questions 15

Floor furnaces shall not be closer than _____ inches to the ground.

Options:

A.

[option text not fully visible in the material you sent]

B.

[option text not fully visible in the material you sent]

C.

[option text not fully visible in the material you sent]

D.

12

Buy Now
Exam Code: M2
Exam Name: Commercial Mechanical Inspector
Last Update: Apr 5, 2026
Questions: 50