Labour Day Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: geek65

LEED-AP-ID+C LEED AP Interior Design + Construction (LEED AP ID+C) V4 Questions and Answers

Questions 4

A client has moved into a building that has photovoltaic panels installed on the roof. Which credit applies?

Options:

A.

Indoor Environmental Quality Credit, Daylight

B.

Energy and Atmosphere Credit, Renewable Energy Production

C.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

D.

Materials and Resources Credit, Interiors life-cycle impact reduction

Buy Now
Questions 5

Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?

Options:

A.

A sink in a shared office restroom

B.

A sink in a private office bathroom

C.

A sink in a private hotel room bathroom

D.

A sink in an employee restroom in a retail store

Buy Now
Questions 6

Which of the following is required for a cooling tower and evaporative condenser in the Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Alkalinity testing, drift eliminators and energy star rating

B.

Makeup water meters, conductivity controllers and overflow alarms

C.

Non potable water sources, makeup water meters and bacteria testing

D.

Water treatment calculations, overflow alarms and system performance narrative

Buy Now
Questions 7

Which systems must be commissioned to earn Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?

Options:

A.

Fire suppression

B.

Irrigation controls

C.

Building Envelope

D.

Daylighting controls

Buy Now
Questions 8

What strategy contributes to achievement of Materials and Resources Credit, Construction and Demolition Waste Management?

Options:

A.

Reuse existing plumbing fixtures

B.

Use on-site soil to re-grade garden

C.

Reuse furniture from the existing space

D.

Return removed carpet to the manufacturer

Buy Now
Questions 9

Based on the results of a six-hour waste stream study, the team for an Interior Design and Construction Retail project plans to provide dedicated areas for four recyclable waste streams: cardboard, plastic, metal, and paper.

The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite, Storage and Collection of Recyclables?

Options:

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Buy Now
Questions 10

Which of the following prerequisites or credits is affected by using plug-in devices when attempting to achieve Indoor Environmental Quality Credit, Thermal Comfort?

Options:

A.

Energy and Atmosphere Credit, Demand Response

B.

Energy and Atmosphere Credit, Advanced Energy Metering

C.

Energy and Atmosphere Prerequisite, Minimum Energy Performance

D.

Energy and Atmosphere Prerequisite, Building Level Energy Metering

Buy Now
Questions 11

For Indoor Environmental Quality Credit, Quality Views, which one of the following space types must be included when calculating the percentage with Quality Views?

Options:

A.

Copy rooms

B.

Break rooms

C.

Conference rooms

D.

Office building lobbies

Buy Now
Questions 12

A project team wants to achieve Materials and Resources Credit, Building Product Disclosure and

Optimization - Material Ingredients. By what means can a product demonstrate their material ingredient optimization?

Options:

A.

Green Seal

B.

Manufacturer Inventory

C.

GreenScreen v1.2 Benchmark

D.

Chemical Abstract Service Registration Number (CASRN)

Buy Now
Questions 13

A design team is working on the hotel interior project in a hot and dry location. A heating, ventilating and air conditioning (HVAC) system is within the project scope. Which of the following strategies will contribute to minimization of ozone depleting potential and global warming potential for the project?

Options:

A.

Purchasing carbon offsets

B.

Providing operable windows

C.

Incorporating evaporative cooling

D.

Using multiple small packaged units

Buy Now
Questions 14

In a goal-setting workshop, a decision is made to place circulation at the exterior of the office perimeter next to the window wall. Which of the following is an example of integrated decision-making?

Options:

A.

Installing blinds to increase occupant comfort

B.

Darkening the color of the carpet along the perimeter to aid way-finding

C.

Lowering the heating set-point in the circulation space to conserve energy

D.

Issuing user guidelines which limit the height of occupant additions to cubicles along the perimeter

Buy Now
Questions 15

Best practices recommend that the LEED AP confirm that minimum program requirements have been met

Options:

A.

as part of the discovery phase

B.

as part of the final certification submittal

C.

after the design phase but before construction

D.

after the Commissioning (Cx) review but before design phase submittal

Buy Now
Questions 16

When attempting Regional Priority Credit, Regional Priority what must be provided in the documentation?

Options:

A.

Location

B.

Climate zone

C.

ENERGY STAR® score

D.

Heating and cooling degree days

Buy Now
Questions 17

Which of the following statements is correct when defining the project boundary?

Options:

A.

The project boundary must be defined by the limit of construction

B.

The LEED project boundary cannot include more than one building

C.

The gross floor area of the LEED project should be no less than 1,000 ft2 (93 m2)

D.

Contiguous land that is associated with the project that is altered as a result of construction must be included

Buy Now
Questions 18

Which of the following phases should be included in the Integrative Process Credit, Integrative Process in order to comply with the intent of this credit?

Options:

A.

Discovery; design and construction; occupancy; operations and feedback

B.

Discovery and design; construction and occupancy; post occupancy and operations

C.

Pre-design and design; construction and occupancy; post occupancy and operations

D.

Pre-design and design; construction and pre-occupancy; post occupancy and operations

Buy Now
Questions 19

An owner has expressed concerns to the LEED AP about the costs associated with the integrative process. How can the LEED AP relieve the owner's concerns?

Options:

A.

The LEED AP should explain to the owner that since the integrative process is not a prerequisite, it can be dropped from the project thus cutting back project costs

B.

The LEED AP should explain that while the first costs and the design fees will be higher due to the integrative

process, the operational savings will make up for the extra costs

C.

The LEED AP should explain that the integrative process can easily be postponed and reconsidered until after

the design for the construction phase, when it will most likely save costs for the project

D.

The LEED AP should explain that the integrative process reduces costs by avoiding delays associated with design changes during the construction document phase and reducing change orders during construction

Buy Now
Questions 20

The project architect suggests reducing the area planned for surface parking and replacing it with additional green space. What benefit would this strategy provide to the owner?

Options:

A.

Increase the rainwater infiltration capacity

B.

Decrease the amount of bicycle parking that must be provided

C.

Increase the overall SR (solar reflectance) of the hardscape area

D.

Decrease the required amount of on-street parking that must be provided

Buy Now
Questions 21

What primary role does the LEED AP have during the LEED certification process?

Options:

A.

Runs weekly construction meetings

B.

Authors the Owner's Project Requirements (OPR) document

C.

Determines the LEED certification status of the project

D.

Helps project team members understand the rating system

Buy Now
Questions 22

A tenant is soliciting proposals for a Commissioning (Cx) agent for Energy and Atmosphere Credit, Enhanced Commissioning. Which qualification must the agent meet?

Options:

A.

Subcontractor of construction manager

B.

Not an employee of the project design firm

C.

Member of the Building Cx Association

D.

Commissioning Authority (CxA) with experience in at least one prior project

Buy Now
Questions 23

For an Interior Design and Construction project to earn Innovation Credit, LEED Accredited Professional, who must submit their credentials as a principal participant of the project team?

Options:

A.

The project administrator

B.

A LEED AP without specialty

C.

The LEED AP with any specialty

D.

The LEED AP with ID+C specialty

Buy Now
Questions 24

A tenant implements the following strategies to reduce the amount of water used. Which strategy is applicable to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction: Commercial Interiors?

Options:

A.

Composting toilet

B.

Low-flow irrigation system

C.

Commercial clothes washer

D.

Roof runoff for chiller make-up water

Buy Now
Questions 25

After the construction and installation of all finishes and furnishing of a new 36,000 ft2 (3 344.5m2) office space, what is the minimum total volume of outdoor air that is required during a non-phased flush-out procedure to achieve Indoor Environmental Quality Credit, Indoor Air Quality Assessment?

Options:

A.

126,000,000 ft3 (3 567 922.7 m3)

B.

378,000,000 ft3 (10 703 768.1 m3)

C.

504,000,000 ft3 (14 271 690.7 m3)

D.

522,000,000 ft3 (14 781 394.0 m3)

Buy Now
Questions 26

When developing the overall energy strategy of the project, which credit should the client consider to work synergistically with the Energy and Atmosphere Credit, Enhanced Commissioning, on an ongoing basis?

Options:

A.

Advanced Energy Metering

B.

Renewable Energy Production

C.

Green Power and Carbon Offsets

D.

Enhanced Refrigerant Management

Buy Now
Questions 27

Occupancy numbers must be reported consistently across multiple LEED credits. Which of the following prerequisites/credits require using the Occupancy numbers?

Options:

A.

Location and Transportation Credit, Bicycle Facilities;

Water Efficiency Credit, Indoor Water Use Reduction;

Indoor Environmental Quality Prerequisite Minimum Indoor Environmental Quality Performance

B.

Location and Transportation Credit, Access to Quality Transit;

Water Efficiency Credit, Indoor Water Use Reduction;

Indoor Environmental Quality Credit, Quality Views

C.

Location and Transportation Credit, Bicycle Facilities;

Indoor Environmental Quality Prerequisite Minimum Indoor Environmental Quality Performance;

Indoor Environmental Quality Credit, Quality Views

D.

Location and Transportation Credit, Access to Quality Transit;

Water Efficiency Credit, Indoor Water Use Reduction;

Indoor Environmental Quality Credit, Interior Lighting

Buy Now
Questions 28

What percentage of occupants require individual control of thermal systems under Indoor Environmental Quality, Thermal Comfort?

Options:

A.

25%

B.

50%

C.

75%

D.

90%

Buy Now
Questions 29

The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

Options:

A.

be advertised as LEED compliant

B.

be both water efficient and high performing

C.

comply with mandatory federal government regulations

D.

comply with all international plumbing system requirements

Buy Now
Questions 30

A mechanical engineer needs to determine the number of carbon dioxide monitors needed for the public area of a hotel. The public area includes the hotel front desk, the hotel lobby, two public restrooms and one corridor.

The aim is to achieve Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2. Additional Enhanced IAQ Strategies, Part C. Carbon Dioxide Monitoring. The project's LEED AP

should recommend a minimum of how many CO2 monitors?

Options:

A.

One

B.

Two

C.

Four

D.

Five

Buy Now
Exam Code: LEED-AP-ID+C
Exam Name: LEED AP Interior Design + Construction (LEED AP ID+C) V4
Last Update: May 8, 2024
Questions: 100
LEED-AP-ID+C pdf

LEED-AP-ID+C PDF

$28  $80
LEED-AP-ID+C Engine

LEED-AP-ID+C Testing Engine

$33.25  $95
LEED-AP-ID+C PDF + Engine

LEED-AP-ID+C PDF + Testing Engine

$45.5  $130