L4M3 Commercial Contracting Questions and Answers

Questions 4

A category buyer is purchasing medical gases for a hospital, but is experiencing volatile and unfavourable market conditions due to multiple global external factors. Owing to the volatility, the hospital's finance director has tasked the buyer with providing certainty of costs for the next 18 months. Which of the following pricing methods will enable budgeting certainty, despite the highly volatile market conditions?

Options:

A.

A fixed pricing arrangement

B.

A cost plus award fee agreement

C.

Fixed pricing with economic price adjustments

D.

A penetration pricing strategy

Buy Now
Questions 5

Which of the following may be a benefit for purchaser in using call off contract?

Options:

A.

Ability to discover new potential suppliers

B.

No long-term commitment required

C.

Secured supply

D.

Maintaining a degree of competition between suppliers

Buy Now
Questions 6

Which of the following are the conditions for revocation of offer to be valid?

1. The offeree has not received the offer yet

2. Revocation of offer must be communicated with the offeree

3. Revocation of offer must be sent via email

4. Offeree has not accepted the offer yet

Options:

A.

2 and 4 only

B.

1 and 4 only

C.

1 and 3 only

D.

2 and 3 only

Buy Now
Questions 7

Maximum Score 1

Procurement professionals must have an awareness of labour standards and environmental, social and governance issues when contracting with suppliers. Which TWO of the following are relevant for consideration?

Options:

A.

Indemnity

B.

Warranty

C.

Modern Slavery

D.

Sustainability

E.

ISO 9000 accreditation

Buy Now
Questions 8

In the UK, Unfair Contract Terms Act 1977 regulates which of the following?

Options:

A.

Validity of a contract when it is formed on the basis of misrepresentation

B.

Rules regarding battle of the forms

C.

Effectiveness of contract terms in the standard terms and conditions

D.

Rule of offer and acceptance

Buy Now
Questions 9

A procurement professional is drafting payment terms for a commercial contract. He is considering about payment method if defective products are found. Which of the following should be embedded in payment terms to control this issue?

Options:

A.

Remedies for late payment

B.

Pay-less notice

C.

Invoice preparation

D.

Retention clause

Buy Now
Questions 10

John Powers is the managing director of ACC Trading Ltd, which provides components to the automotive industry. His company has been providing number plates to Elite Motors Ltd for many years. As John Powers and Peter Ellis, the MD of Elite, have been friends for a long time, there has never been a formal contract agreed between the companies. Following a downturn in the market, Elite Motors Ltd has now been placed in administration. ACC recently delivered 200 number plates but have not received payment. As the number plates have been fitted to some vehicles, the administrators are being very slow to return them. Which clause in a formal agreement would have helped John?

Options:

A.

Force Majeure

B.

Retention of Title (Romalpa)

C.

Liquidated Damages

D.

Penalty Clause

Buy Now
Questions 11

Buyer D agrees a contract with Supplier C which includes the words 'to be agreed' in relation to the date for delivery of the goods. At the time of the contract, Buyer D is aware that the goods take two days to produce and one day to deliver. Buyer D contacts the supplier one week later, requesting the goods be delivered the following day. Supplier C is unable to deliver the next day but rather delivers the goods three days later. Is it the case that Buyer D can legally refuse to pay for the goods because Supplier C is in breach of contract?

Options:

A.

Yes, because the delivery date is an express term within the contract

B.

Yes, because the goods should have been delivered within three days

C.

No, because the goods were delivered within a reasonable time

D.

No, because there is a contract in place and the delivery date does not matter

Buy Now
Questions 12

Consequences and actions that arise from certain KPI scores must be...? Select TWO that apply.

Options:

A.

Mutually agreed

B.

Deliberately omitted

C.

Documented

D.

Unilaterally imposed by the purchaser

E.

Terminated

Buy Now
Questions 13

Which of the following is a true statement on express and implied terms?

Options:

A.

Express terms always take precedent over implied terms

B.

Implied terms may derive from oral negotiations

C.

Express terms must always be in writing

D.

Express terms must be prepared by the party with expert knowledge

Buy Now
Questions 14

ABC Ltd is a UK based company. It plans to enter into a contract with XYZ Ltd which is based in Singapore. Which of the following are the mandatory elements for the contract between ABC Ltd and XYZ Ltd to be legally binding? Select THREE that apply.

Options:

A.

All parties must have capacity to contract

B.

The two parties must have intention to be bound

C.

The invitation to tender must be sent by the agreed deadline

D.

There must be an offer and an acceptance

E.

An amount of money must be paid upfront

F.

There must be an invitation to treat

Buy Now
Questions 15

Which of the following are implied terms in sales contracts? Select THREE that apply.

Options:

A.

Payment method

B.

Customer satisfaction

C.

Transfer of ownership

D.

Risk transfer

E.

Fitness for purpose

F.

Mode of transportation

Buy Now
Questions 16

Nestle gave away records of “Rockin’ Shoes” or a voucher to people who sent in three wrappers from Nestle’s 6d. milk chocolate bars as well as 1s 6d. Which of the following were the consideration of Nestle’s customer? Select TWO that apply

Options:

A.

Three wrappers

B.

1s 6d

C.

“Rockin’ Shoes” record

D.

The voucher

E.

Milk chocolate bar

Buy Now
Questions 17

Cleveland Insurance (Cleveland) offers a range of insurance services. The main software used in the call centre is a customer relationship management (CRM) system. Cleveland perceived an urgent need to replace the existing CRM system to deal with the increasing number of customers and services.

Urgent Digital Ltd (Digital) is one of the bidders of Cleveland’s ITT. Its bid team is led by Hank Irvine, its technical director. Hank realises that winning the Cleveland contract (valued at approximately £50M) will enhance his career. During discussions with Cleveland, Hank offers certain assurances regarding timescales for the project. He has not carried out any investigations into the viability of the timescales. Hank has little idea whether the timescales can be met.

Cleveland decides that Digital’s bid meets with its requirements, especially given the assurances in timescale offered by Hank, and decides to proceed with it, subject to a formal contract. Eventually, a formal contract is signed by both parties. The initial assurances given by Hank about the timing of the project are never going to be achieved and are at best grossly exaggerated.

Hank’s pre-contractual assurance is most likely to be an example of which of the following?

Options:

A.

Inaccuracy in communication

B.

Threat

C.

Initial impossibility

D.

Fraudulent misrepresentation

Buy Now
Questions 18

Which of the following are typically included in an SLA? Select TWO that apply:

Options:

A.

Requirements for packaging

B.

Service definition

C.

KPI detailsCorrect)

D.

Code of conduct

E.

Product's lifespan

Buy Now
Questions 19

Maximum Score: 1

A service contract for cleaning is due for expiry after a five year duration. Which of the following are good sources of data to create a specification for the new invitation to tender?

    Incumbent supplier

    Maintenance services

    Alternative suppliers

    Management information

Options:

A.

1, 2 and 3 only

B.

2, 3 and 4 only

C.

1, 3 and 4 only

D.

1, 2 and 4 only

Buy Now
Questions 20

Which of the following clauses addresses fraud, bribery and corruption?

The Company has undertaken commercially reasonable efforts to eliminate Conflict Minerals from each Company Product and any products currently proposed to be manufactured by the Company or on its behalf in the future. “Conflict Minerals” means columbite-tantalite (coltan),cassiterite, gold, wolframite, or their derivatives, which originate in the Democratic Republic of the Congo or other country the exploitation and trade of which is determined by the United States to be financing conflict in the Democratic Republic of the Congo or other country.

Options:

A.

Customer will be responsible for and shall ensure that while Service Provider employees, agents or contractors are on Customer’s premises, all proper and legal health and safety precautions are in place and fully operational to protect such persons.

B.

Nothing in this Agreement shall prevent a Party from utilizing the services of any subcontractor as it deems appropriate to perform its obligations under this Agreement; provided, however, that each Party shall require its subcontractors to comply with all applicable terms and conditions of this

C.

Agreement in providing such services and each Party shall remain primarily liable to the other Party for the performance of such subcontractor.

D.

Each Party hereby undertakes that, at the date of the entering into force of the Contract, itself, its directors, officers or employees have not offered, promised, given, authorized, solicited or accepted any undue pecuniary or other advantage of any kind in any way connected with the Contract and that it has taken reasonable measures to prevent subcontractors, agents or any other third parties, subject to its control or determining influen

Buy Now
Questions 21

Which of the following is most likely to be an one-off contract?

Options:

A.

Franchise Agreement

B.

Framework Agreement for supply of mono-crystalline silicon

C.

Contract for construction of a power plant

D.

Commercial lease agreement of an office building

Buy Now
Questions 22

A school has a contract for the supply of fruit for break time. The school needs the fruit delivered by 10am every morning to be served at 10:30am. How would this best be covered in a commercial agreement?

Options:

A.

Note on each purchase order

B.

Pricing schedule

C.

Sales of Goods Act 1974

D.

Contractual term

Buy Now
Questions 23

Maximum Score 1

Denny is putting together the final version of a contract to send out to a supplier. He places certain documentation into additional contract schedules at the end of the main contract.

Which of the following would be suitable inclusions to the additional schedules? Select TWO that apply.

Options:

A.

Financial statements

B.

Health and safety commitments

C.

Suppliers references

D.

Non-disclosure agreement

E.

A blank RFQ form

Buy Now
Questions 24

Company A buys a lorry from Company B on hire purchase. During the contractual period, Company A makes default in paying the instalment. Company B has...?

Options:

A.

The right to take repossession of the lorry

B.

The option to repossess the lorry

C.

No right to take repossession

D.

Company B has to approach the court

Buy Now
Questions 25

Under hire purchase agreement, when will the ownership of asset legally belong to the purchaser?

Options:

A.

When the final instalment is paid

B.

When the purchaser takes possession of the asset

C.

When the down payment is made

D.

When the agreement is signed

Buy Now
Questions 26

Which of the following are advantages of using a model form contract in negotiations between buyer and seller?

These contracts can save time in negotiations

Each contract is approved by the courts

These contracts are appropriate for all complexities

The contracts are well-known to both parties

Options:

A.

1 and 2

B.

2 and 3

C.

3 and 4

D.

1 and 4

Buy Now
Questions 27

According to mailbox rule in some common law countries, at which point the offeree's acceptance will be effective?

Options:

A.

When the letter of acceptance is opened and its contents read by the offeree.

B.

When the letter of acceptance is received by the offeror.

C.

When the letter of acceptance has been written.

D.

When the letter of acceptance has been correctly addressed, its postage paid, and posted.

Buy Now
Questions 28

A buyer is procuring innovative new IT systems and has issued a performance specification as part of the invitation to tender. Is this a suitable approach?

Options:

A.

No, because the bidder may use it to inflate costs

B.

Yes, because it allows the bidder to present solutions and further inform the requirement

C.

No, because the Procurement Team should only include outputs in specifications

D.

Yes, because it will improve relationships and collaboration between both parties

Buy Now
Questions 29

Carillion Ltd is a major construction contractor in the UK. The company commits to continuous improvement and sets out a performance management program that is integrated across the organisational, individual, and supplier levels. To ensure that the suppliers acknowledge the program, every time negotiating the contract terms with suppliers, the procurement team of Carillion appends a performance management framework to the draft document as a schedule. Is the action of procurement team appropriate?

Options:

A.

No, because the framework will increase the complexity of the contract

B.

No, because the performance management should be solely developed by suppliers

C.

Yes, because the framework should have legal standing as a part of contract

D.

Yes, because Carillion wants to implement early supplier involvement

Buy Now
Questions 30

A procurement manager is setting KPIs measurement for user satisfaction. He also wants to encourage users to share the reason why they feel the way they do. Which of the following types of KPI should the procurement manager apply?

Options:

A.

Quantitative measure

B.

Numerical measure

C.

Binary measure

D.

Qualitative assessment

Buy Now
Questions 31

John is a new procurement manager who has recently joined Smiths Facilities Management Ltd. The company provides maintenance services through the utilisation of subcontractors. It is experiencing a number of issues with its supply chain which has resulted in customer complaints, and John would like to introduce service level agreements (SLAs) to some of its key providers. Which of the following should be included?

    How often the service will be provided

    The procedures to be followed to resolve disputes

    The qualifications needed by staff providing the service

    The stock maintained by the subcontractor

Options:

A.

1, 3 and 4 only

B.

2, 3 and 4 only

C.

1, 2 and 4 only

D.

1, 2 and 3 only

Buy Now
Questions 32

RL Corporation are developing a specification for a new piece of equipment. They have no prior experience of procuring the item. The procurement manager wants to understand the benefits and risks of conducting market dialogue to help inform the procurement strategy. Which of the following are three potential advantages of market dialogue? Select THREE that apply.

Options:

A.

There is no need to conduct a full procurement process

B.

More collaborative supplier relationships can be developed

C.

Organisations can clarify and optimise the requirements

D.

The procurement process becomes significantly quicker

E.

Purchasers can gauge market interest and competition

F.

Market dialogue is risk-free as there is no contract or agreement

Buy Now
Questions 33

Which of the following should be done by procurement professionals right after obtaining a pre-written specification for a critical item so that the added value will be the greatest?

Options:

A.

Evaluate tender or quotation

B.

Select the best supplier

C.

Challenge the used specification

D.

Issue invitation to tender or request for quotation

Buy Now
Questions 34

Blakenall District Hospital (BDH) is a large hospital that is a major part of the government’s health service. Purchasing staff are in the habit of placing many long-term contracts with suppliers and sub-contractors. Whilst these contracts are usually carried out successfully, prices are often paid that are well over budget. The purchasing manager is concerned to find that, in some cases, members of staff are forcing suppliers to accept fixed price contracts. The policy hascaused several problems such as some suppliers refusing to deal with BDH and a few going out of business mid-way through performing a contract with BDH. This is due to fluctuating market prices of materials. The procurement manager suggests supplier to adopt variable pricing arrangement with price index. Is this a right course of action?

Options:

A.

No, variable pricing would only benefit the suppliers

B.

Yes, this type of arrangement would provide absolute certainty when budgeting

C.

Yes, this pricing arrangement would reimburse the fluctuation of material prices

D.

No, price adjustment should be applied to short-term supply contract only (3-month duration or less)

Buy Now
Questions 35

Which of the following is a benefit to the buyer of using model form contracts?

Options:

A.

The terms used are advantageous to the buyer

B.

It reduces time and costs in developing a formal contract

C.

No legal advice is required as variations are not accepted

D.

Most suppliers are unfamiliar with the terms used

Buy Now
Questions 36

Under which of the following scenarios an RFQ is most likely to be used?

Options:

A.

Purchase of a small number of standardised products under a framework agreement

B.

Purchase of complex machinery

C.

Design of a unique and complex software code

D.

When the buying organisation does not know the requirements in details and needs the input from suppliers

Buy Now
Questions 37

A large company supplies a lot of products. Their shipments are often delayed and customers are not satisfied. Which of the following KPIs is most likely to be applied to this situation?

Options:

A.

Technical support

B.

OTIF delivery

C.

Delay damages

D.

Consignment stock availability

Buy Now
Questions 38

Maximum Score 1

The nature of the "Battle of the forms" is when both buyer and supplier are attempting to ...

Options:

A.

Secure their own terms and conditions

B.

Create a collaborative relationship

C.

Create a performance specification

D.

Form a joint contract

Buy Now
Questions 39

Which of these describes “consideration” within a contract?

Options:

A.

The communication of an unconditional agreement

B.

Both parties exchange something of value

C.

The desire of both parties to enter into a contract

D.

Ability of both parties to be able to enter into a contract

Buy Now
Questions 40

Is a verbal contract legally enforceable?

Options:

A.

Yes, a verbal agreement is just as legally enforceable as a written one

B.

Yes, but only if you have a witness at the time the verbal agreement was made

C.

No, only contracts in writing will be legally enforceable

D.

No, verbal contracts are never legally enforceable

Buy Now
Questions 41

CMS Corp goes into a gainshare agreement with the contractor, EIP Ltd. Both parties agree that the final fee will be calculated on target cost - target fee basis. Which of the following will affect the final fee payable in this gainshare agreement? Select TWO that apply:

Options:

A.

Accrual expense

B.

Final price

C.

Purchaser goodwill

D.

Supplier share

E.

Actual cost

Buy Now
Questions 42

Which of the following should include in the service level agreement that is an appendix of a contract?

1. How often the service is measured

2. Minimum qualification of supplier staffs

3. Remedies to resolve dispute

4. On time service delivery

Options:

A.

1, 3 and 4 only

B.

1, 2 and 3 only

C.

2, 3 and 4 only

D.

1, 2 and 4 only

Buy Now
Questions 43

Which of the following is always automatically considered as a contract?

Options:

A.

Call-off

B.

Framework arrangement

C.

Performance management framework

D.

Framework agreement

Buy Now
Questions 44

As part of a long-term contract, a buyer may wish to use separate service level agreements (SLAs). If the targets are not met, which of the following options would compensate the purchaser?

Options:

A.

Service guarantees

B.

Service credits

C.

Service standards

D.

Service schedules

Buy Now
Questions 45

CISG will be most likely to apply to which of the following transactions?

Options:

A.

Sale of electricity

B.

Sale of a property

C.

Sale of iron ores

D.

Sale of a ship

Buy Now
Questions 46

An organization has a normal tender process that often last 1 month from defining the needs to contract award. Manufacturing department suddenly required a new special part that they could not foresee within a month. Which of the following should be the priority actions of procurement manager in this urgent situation? Select TWO that apply:

Options:

A.

Design new specification

B.

Develop relationships with potential suppliers

C.

Review contract performance

D.

Get high-level authority approval

E.

Submit full business justification

Buy Now
Questions 47

When should liquidated damages clauses be written into a contract?

Options:

A.

When the innocent party wants to punish the breaching party.

B.

When the breaching party wants to exclude all its liabilities

C.

When the court approves the damages amount before the contract is executed.

D.

When the loss to the innocent party will be either too uncertain or too difficult to calculate.

Buy Now
Questions 48

If a false statement of material fact is made by one of the contracting parties, the misled party will have remedies for:

Options:

A.

Indemnity

B.

Misrepresentation

C.

Recission

D.

Damages

Buy Now
Questions 49

Which of the following is the procedure that makes no further competition under a framework agreement?

Options:

A.

Closed system

B.

Direct call-off

C.

Standing offer

D.

Blanket order

Buy Now
Questions 50

SFO procurement manager sent a request for quotation to Vogon International in which he determined the contract terms and specification. In SFO's standard terms and conditions, it is stated that 'Goods shall be delivered and Services performed by the applicable Delivery Date. Supplier must notify Buyer 3 days prior to the Delivery Date if Supplier is likely to be unable to meet a Delivery Date.'

Vogon replied with a quotation without any amendment to SFO's terms & conditions. The SFO procurement manager found the prices were reasonable and submitted to senior management. Senior management team accepted that quotation and sent a notification to Vogon. On the Delivery Date, Vogon said they had no capacity to supply the product as the quotation due to a workers' strike. Did Vogon breach any agreement with SFO?

Options:

A.

No, because Vogon had no intention to be bound by the quotation, therefore, it didn’t constitute a contract

B.

No, because the strike is a force majeur event, so Vogon did not breach any contract with SFO

C.

Yes, because the contract was formed since Vogon had sent the quotation as an acceptance to SFO’s offer

D.

Yes, because the contract had been formed between SFO and Vogon with the quotation as an offer and the notification as an acceptance

Buy Now
Questions 51

Which of the following are the 'fundamental' labour standards laid down by the International Labour Organisation?

1. Elimination of child labour

2. Payment of a minimum wage

3. The right to collective bargaining

4. Abolition of forced labor

Options:

A.

1, 2 and 4 only

B.

2, 3 and 4 only

C.

1, 3 and 4 only

D.

1, 2 and 3 only

Buy Now
Questions 52

Which of the following would be useful tools to incentivise supplier innovation over the duration of the contract?

1. Gainshare arrangement

2. Liquidated damages

3. Service credits

4. Fixed bonus payments

Options:

A.

3 and 4 only

B.

2 and 4 only

C.

1 and 4 only

D.

1 and 3 only

Buy Now
Questions 53

Which of the following are likely to be express terms in a contract?

1. Legislation

2. Custom and practice

3. Contract particulars

4. Terms and conditions

Options:

A.

2 and 3 only

B.

1 and 4 only

C.

3 and 4 only

D.

1 and 2 only

Buy Now
Questions 54

Maximum Score 1

Which of the following are key performance indicators (KPIs) that could be used to monitor the safety of a workplace?

    The number of non-routine maintenance call-outs per month

    The number of orders and deliveries for personal protective equipment (PPE)

    The number of reported accidents and incidents per month

    A calculation of the number of injuries sustained per number of hours worked

Options:

A.

2 and 4 only

B.

3 and 4 only

C.

1 and 2 only

D.

1 and 3 only

Buy Now
Questions 55

Company A sends a purchase order complete with a set of conditions of contract for the provision of professional services to Company B. Company B responds with an invoice complete with a set of its own conditions of contract. Company A pays the invoice. Whichconditions of contract take legal precedence?

Options:

A.

Company A's

B.

Company B's

C.

Neither Company A's nor Company B's

D.

Both Company A's and Company B's

Buy Now
Questions 56

Which of the following is a key element for the development of a contract?

Options:

A.

Scoping specifications

B.

Contract management

C.

Budget approval

D.

Managing suppliers

Buy Now
Questions 57

In a contract, express terms and implied terms may contradict on the same issues. Under which of the following circumstances, implied terms will override express terms?

Options:

A.

Implied terms are created by trade customs

B.

Contracting parties are silent on a matter that was not included in express terms

C.

No circumstances. Express terms always take precedence over implied terms

D.

Implied terms are created by law which prevents them to be overridden

Buy Now
Questions 58

Royal Naval Hospital at Rockstown, Anyport manages a fleet of nine ambulance vehicles. During busy periods, it becomes very difficult to keep track of the location of each ambulance (and the nature of their journey). Continual problems lead to the proposal for a new control system (ERNS).

For this ERNS project, the procurement department has drafted a specification in which only a bullet point list of basic requirements was written down. The procurement manager understands that the specification should be developed more specifically but a cross functional team from the Hospital could not do that. A senior buyer suggests that some of Hospital's pre-qualified suppliers could support them in developing the specification.

Which of the following should be a priority approach of procurement department in developing dialogue with those suppliers about specification development?

Options:

A.

Internal discussion

B.

General networking

C.

One-to-one meeting with the suppliers

D.

Request for quotation from the suppliers

Buy Now
Questions 59

Various terms are used to qualify a party's obligations under contract. Which of the following gives absolute obligation?

Options:

A.

Reasonable endeavours

B.

Shall

C.

Best endeavours

D.

Should

Buy Now
Questions 60

Bethy sees a coat on shop window with a $100 price tag. She comes and asks the shop owner to buy it. The owner states that the price has not been updated and the current price for the coat is $120. Bethy says the owner should honour the quoted price on window shop. Is Bethy correct?

Options:

A.

Yes, the owner has made an offer by showing his product on the shop window and he must honour that offer

B.

Yes, $120 for a coat is extremely unreasonable and the owner's later offer therefore void

C.

No, the display on shop window is just an invitation to treat and the owner may change the price at his will

D.

No, the owner is revoking his initial offer to sell at $100 and he is proposing new offer to Bethy

Buy Now
Questions 61

Which of the following are likely to be advantages of using request for quotation? Select TWO that apply:

Options:

A.

Lower administration costs

B.

Short turnaround times

C.

No specification required

D.

Helping the buying organisation assess both price and quality

E.

Encouraging suppliers to submit creative solutions

Buy Now
Questions 62

GPP, the employer, and Prosolia UK, the contractor, entered into five EPC contracts for the development of five different solar power generation plants in the United Kingdom. Four out of the five developments failed to be commissioned by the relevant due dates, with the delays ranging from 44 to 285 days.

Among other claims, GPP, acting through its two investment vehicles, claimed liquidated damages of £500 per day in all four contracts for Prosolia UK's failure to achieve completion of the plants by the due date. The liquidated damages claimed amounted to £1,804,221 across the four delayed contracts.

Prosolia, alongside various other defences, raised the defence that the liquidated damages provision in each contract was a penalty, and therefore unenforceable against it. Is Prosolia contractually obliged to make the payment to the plaintiff?

Options:

A.

No, the amount claimed is too excessive and it may put Prosolia into insolvency. The clause must be void

B.

No, the clause must be treated as a penalty clause which is unenforceable in UK

C.

Yes, the amount is a reward to the employer as they have supervised and monitored the projects

D.

Yes, the clause is a genuine estimate of possible losses that GPP may have suffered and therefore, it is enforceable.

Buy Now
Questions 63

A tire manufacturer entered into a contract with a distributor. In the contract, the distributor is prohibited from selling the tire under the price list. The distributor must pay $5 for each tire sold in breach. The amount of $5 is known as...?

Options:

A.

Penalty

B.

Quantum meruit

C.

Liquidated damages

D.

Caveat Emptor

Buy Now
Questions 64

Which of the following is most likely to reduce ITT preparation time while maintaining the clarity of tendering documents?

Options:

A.

Using request for quotation

B.

Standardising documentation whenever possible

C.

Monitoring usage

D.

Eliminating pre-qualification stage from all tendering processes

Buy Now
Questions 65

Under a price adjustment agreement, which of the following would be supplier's justification for increasing unit price?

Options:

A.

Rise in fuel price

B.

Rise in economies of scale

C.

Rise in shares price

D.

Rise in customer's satisfaction

Buy Now
Questions 66

Which of the following would you expect to see in an Invitation to Tender (ITT)?

Options:

A.

Supplier rates

B.

Liquidity ratios

C.

Delivery milestones

D.

Best and Final Offer (BAFO)

Buy Now
Questions 67

A senior buyer is preparing specification for the next purchase. He intends to embed social and environmental criteria that align with his organisation's overarching strategy. Which of the following provides the social and environmental objectives that an organisation pursues?

Options:

A.

Economic performance

B.

Procurement Systems and Technology

C.

Economy of scale

D.

Organisation’s CSR policies

Buy Now
Questions 68

Maximum Score 1

A purchase order has been raised for £5,000. It allows the user department to order items of a £50 value when they need them. This is an example of what type of order?

Options:

A.

Shut-off

B.

Stand-off

C.

Straight-off

D.

Call-off

Buy Now
Questions 69

Maximum Score: 1

Which of the following would be considered as advantages of an industry model form contract?

    It provides greater flexibility for negotiation

    It reduces the cost of contract development

    It is usually designed to be fair to both parties

    It removes the need for the buyer to understand it

Options:

A.

1 and 2 only

B.

2 and 3 only

C.

1 and 3 only

D.

2 and 4 only

Buy Now
Exam Code: L4M3
Exam Name: Commercial Contracting
Last Update: Nov 16, 2025
Questions: 233
L4M3 pdf

L4M3 PDF

$25.5  $84.99
L4M3 Engine

L4M3 Testing Engine

$30  $99.99
L4M3 PDF + Engine

L4M3 PDF + Testing Engine

$40.5  $134.99