Labour Day Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: geek65

HPE0-S59 HPE Compute Solutions Questions and Answers

Questions 4

Your customer wants to add dedicated Fibre Channel connectivity to the HPE Synergy frame running HPE Synergy 480 Gen10 compute modules, each with one CPU socket populated Currently they use two 12 Gb SAS switches and two HPE Virtual Connect SE 100Gb F32 Modules for HPE Synergy installed in third fabric.

What must be done to enable dedicated FC connectivity for this HPE Synergy frame?

Options:

A.

A second CPU must be installed for all HPE Synergy 480 Gen10 compute nodes.

B.

For Brocade switches, a logical interconnect group must be created in HPE OneView.

C.

For VC-FC modules, all of server facing ports must be property licensed.

D.

SAS switches must be moved to second fabric and FC modules Installed in the first one.

Buy Now
Questions 5

What is a restriction of using a RoCE network?

Options:

A.

It is by default configured as an untagged network and cannot be a part of a network set.

B.

It does not support Private VLAN and Multicast VLAN.

C.

it is not supported with HPE Virtual Connect SE 40 GD F8 Module for HPE Synergy.

D.

It does not support smart link and private network features.

Buy Now
Questions 6

Your customer has 6 logical enclosures spanning 18 HPE Synergy frames. The customer needs to add one more logical enclosure based on 5 HPE Synergy frames

How will this change impact the customer environment?

Options:

A.

The customer can add a new logical enclosure to the existing setup because the maximum number of logical enclosures in a single management ring is not reached.

B.

The customer has to expand the management ring capacity either by adding HPE Composer 2 modules or adding memory to reach 128GB per module.

C.

The customer has to create a new management ring for new logical enclosure because the maximum number of frames m a single management ring is reached.

D.

The customer can add a new logical enclosure to an existing setup once all required licenses are added lo HPE OneView and associated with the new frames.

Buy Now
Questions 7

Refer to the exhibit.

Which statement about this logical interconnect group is true?

Options:

A.

The master modules are located in the interconnect bays 2 and 5

B.

For the given downlink speed, the maximum number of frames is reached

C.

Both master modules are located in the same HPE S ynergy frame

D.

To use interconnect bay set 3, all compute nodes must be half-height

Buy Now
Questions 8

Your customer plans to deploy VMware ESXi 7 0 U2 and they are looking for a hardware platform mat wilt allow them to use up to 24 TB of physical memory.

Which HPE compute system meets this customer's requirements?

Options:

A.

HPE ProLiant DL380 Gen 10 Plus

B.

HPE Synergy 480 Gen10 Plus

C.

HPE ProLiant DL560 Gen10

D.

HPE Superdome Flex 280

Buy Now
Questions 9

Your customer plans to use HPE Primera to boot HPE Synergy compute nodes. They currently have two HPE Virtual Connect SE 100Gb F32 Module for Synergy modules installed in the frame. The customer wants to use FC as a storage access protocol

What must be done to complete this task?

Options:

A.

Enable FC primary and secondary boot on the modules through the HPE OneView interface

B.

FC connectivity on the modules should be enabled through the service console by disabling FCoE.

C.

Add FC upgrade licenses in HPE OneView that will enable FC connectivity for the modules

D.

Enter both modules into a maintenance mode, then enable FC connectivity through CLI

Buy Now
Exam Code: HPE0-S59
Exam Name: HPE Compute Solutions
Last Update: May 1, 2024
Questions: 60
HPE0-S59 pdf

HPE0-S59 PDF

$28  $80
HPE0-S59 Engine

HPE0-S59 Testing Engine

$33.25  $95
HPE0-S59 PDF + Engine

HPE0-S59 PDF + Testing Engine

$45.5  $130