H12-411_V2.0 HCIA-Data Center Facility V2.0 Questions and Answers

Questions 4

Dual power switch ATS According to different switch types, it can be divided into ____________ .

Options:

Buy Now
Questions 5

The three major indicators of air conditioning are ____________ .

Options:

Buy Now
Questions 6

There are three different classifications of grounding forms in low-voltage power distribution systems, ____________ . The second capital letter represents ____________ .

Options:

Buy Now
Questions 7

The condensate of the air conditioner is formed by condensation after the air warning surface cooler cools down.

Options:

A.

True

B.

False

Buy Now
Questions 8

The gas fire extinguishing system consists of ____________ .

Options:

Buy Now
Questions 9

In the access control system interface, the functions that can be realized are ____________ .

Options:

Buy Now
Questions 10

STS The static transfer switch can switch between different input power sources and provide dual power supply for single power loads.

Options:

A.

True

B.

False

Buy Now
Questions 11

The fire fighting system of the computer room is mainly composed of ____________ system.

Options:

Buy Now
Questions 12

The following outdoor unit models belong to dual fans are ____________ .

Options:

Buy Now
Questions 13

One ups The capacity is 200KVA, Its output power factor is 0.9, Then it can drive at most ____________ load.

Options:

Buy Now
Questions 14

The principle of the evaporator is to convert the refrigerant from liquid to gas, take away the heat of the refrigerated object, and realize refrigeration.

Options:

A.

True

B.

False

Buy Now
Questions 15

UPS Common system configurations are N system,N+X system,2N system.

Options:

A.

True

B.

False

Buy Now
Questions 16

____________ The main function is electric energy distribution, which distributes the front-end electric energy to various types of electrical equipment according to requirements, standards and

specifications, such as ups, Air conditioning, lighting system, etc.

Options:

Buy Now
Questions 17

CLF Defined as the power consumption of data center cooling equipment and IT The ratio of the power consumption of the device.

Options:

A.

True

B.

False

Buy Now
Questions 18

The function of the following () parts is to help with oil return.

Options:

A.

liquid lens

B.

oil sight glass

C.

Oil trap

D.

reverse bend

Buy Now
Questions 19

The user can use the ____________ function to assign personnel to handle the fault.

Options:

Buy Now
Questions 20

Huawei Monitoring System NETECO Support video real-time browsing.

Options:

A.

True

B.

False

Buy Now
Questions 21

Huawei chilled water air conditioners rely on ____________ to adjust the water flow.

Options:

Buy Now
Questions 22

The fastest transmission rate of the following communication interfaces is ____________ .

Options:

Buy Now
Questions 23

____________ can complete the conversion from DC to AC.

Options:

Buy Now
Questions 24

PLE Defined as the power consumption of the data center power supply and distribution system and IT The ratio of the power consumption of the device.

Options:

A.

True

B.

False

Buy Now
Questions 25

MCB Circuit breakers can be divided into ____________ and (magnetic trip) according to the principle of tripping.

Options:

Buy Now
Questions 26

The administrator cannot segment the login time and login of other users through the Huawei monitoring system IP Address restrictions.

Options:

A.

True

B.

False

Buy Now
Questions 27

If ups The capacity is 20KVA, Then in normal work,ups The front-end input capacity may be ____________ .

Options:

Buy Now
Questions 28

When the AC power equipment is introduced in the three-phase four-wire system, in addition to the grounding of the near end of the power transformer, the near end of the electrical equipment and the equipment room should be grounded repeatedly on the neutral line.

Options:

A.

True

B.

False

Buy Now
Questions 29

Huawei Monitoring System NetEco Support through ____________, send alarm information to customers.

Options:

Buy Now
Questions 30

The following are air-cooled row-level air conditioners ____________ .

Options:

Buy Now
Exam Code: H12-411_V2.0
Exam Name: HCIA-Data Center Facility V2.0
Last Update: Apr 25, 2024
Questions: 204
H12-411_V2.0 pdf

H12-411_V2.0 PDF

$28  $80
H12-411_V2.0 Engine

H12-411_V2.0 Testing Engine

$33.25  $95
H12-411_V2.0 PDF + Engine

H12-411_V2.0 PDF + Testing Engine

$45.5  $130