An Implementation Engineer arrives on site to complete a shelf evac. What action must take place before Pure Support can run the completion commands?
An Implementation Engineer is assigned to install a 4X Module 9.1 TB Conversion Kit in a Flash Array Chassis. Why are there only four Direct Flash Modules?
An Implementation Engineer completes an installation running 6.x and needs to log back into the array to run final health checks. After rebooting the controllers, which user account should the Implementation Engineer use to log in?
An Implementation Engineer has installed a data pack and the puredrive list command shows the drives in "unadmitted" status.
Which command should the Implementation Engineer run to complete the admission?
During a hardware NDU from a FlashArray//X20R3 to an X20R4-LL (low-line) model, the Implementation Engineer encounters a failure during the power supply check. Voltage readings are correct.
What is a likely cause of this failure?
A data pack has been installed and the puredrive list command shows the drives in “unadmitted” status. Which command should be used to complete the admission?
An Implementation Engineer is onsite to install a new DirectFlash Shelf on a FlashArray//XL that does NOT have any installed. There is an I/O card installed and in use on the default slot for the first shelf.
Where should the Implementation Engineer install the PCIe card for connectivity?
What command should the Implementation Engineer run to view NVRAM install and update status?
A customer would like to reduce SafeMode settings for retention and eradication with their current policy. How is authorization obtained to make the requested changes?
An Implementation Engineer is performing a capacity consolidation on an X50R2 that is 83% full. The starting config is X50R2-20/10-22/0. The end config is X50R2-91/0. What steps should the Implementation Engineer follow to complete the work?
An Implementation Engineer is installing the first DirectFlash Shelf (DFS) on a FlashArray//XR4 controller.
Which ports should the Implementation Engineer use for the connection?
An Implementation Engineer is performing a FlashArray//XR4 to FlashArray//XL upgrade, and is preparing to remove the XR4 CT0 controller.
Which command should the Implementation Engineer run to stop Purity after confirming CT0 is the secondary controller?
A customer has a DirectFlash Shelf installed on a FlashArray//X90R4. The 208V rack PDUs are full, but there are five 120V connections available at the top of the rack. What should the Implementation Engineer understand about powering the DirectFlash Shelf in this scenario?
Which enablement feature will cause Mirrored Write statistics to appear in the Analysis section of the FlashArray Purity 6.x GUI?
An Implementation Engineer is performing a hardware NDU from a fully populated FlashArray//X90R3 to a FlashArray//XL that already contains 20 DFM-Ds. The drive transfer is complete, and the //XL is still in SPM (Shelf Personality Mode).
What is the next step the Implementation Engineer should take to continue the upgrade?
An Implementation Engineer is performing an inventory for an NDU from a FlashArray//X70R2 to a FlashArray//X70R4 and discovers that a complete FlashArray//X70R4 was shipped instead of an NDU kit.
What is the minimum hardware the Implementation Engineer should use from the new array to complete the NDU?
During a FlashArray installation, when should the Implementation Engineer run pureinstall on a controller?
A customer has submitted a Pure Engagement Request (PER) / Implementation Workbook (IWB) and the stated array name is "123". What is the issue With this array name?
On a FlashArray//X50 R2/R3 Fibre Channel (FC) array, what is the default type and placement of the PCIe FC card?
The Pure Engagement Request (PER) specifies that iSCSI ports ETH2 and ETH3 should be set to 10 Gb/s. After configuring the ports and connecting them to the SAN, the Implementation Engineer observes that ETH2/3 are not negotiating and display 0 b/s. The SAN is operating at 40 Gb/s, with support for up to 100 Gb/s. What should the Implementation Engineer do to resolve this issue and complete the install?
By default, which network interface does FA File use to resolve and reach domain controllers?
Prior to installing a new FlashArray controller, which terminal display settings must the Implementation Engineer configure?
For a new FlashArray installation, a customer's network team has NOT provisioned network ports for management connectivity.
How will this affect the installation process?
Which command should an Implementation Engineer use to allow Support access to an array?
Refer to the exhibit.
During the puresetup portion of the new controller setup of an NDU, the Implementation Engineer gets an error message regarding missing or unassigned network interfaces.
What action should the Implementation Engineer take next?
Which PCI cards must be validated on the Bill of Materials (BOM) to allow an Implementation Engineer to attach a DirectFlash Shelf to a FlashArray//XL130R5?
Once the new Purity firmware has been installed using the pureinstall command, what step is required to commit the new version?
What is the default FlashArray//XLR5 - FC configuration shipped for new installs?
In a situation where FC cards need to be re-used during a controller upgrade, which is a valid transfer path?
Which Purity command can be used to validate I/O is balanced across initiators?
If drives need to be relocated within an array for an XFORM upgrade, when should this be completed?
An Implementation Engineer needs to run the puresetup replace procedure on a FlashArray//XR5 during a controller upgrade. What command should the engineer run to identify the array model?
A client needs to upgrade Purity on their FlashArray, but is unable to wait for an available upgrade date from support. What action should the customer take?
An Implementation Engineer performing an inventory of hardware for an NDU from an FlashArray//X70R2 to an FlashArray //X90R3 and discovers a complete FlashArray//X90R3 was shipped in place of an NDU kit. What is the minimum hardware the Implementation Engineer should use from this array to complete the NDU?
When accessing the FlashArray GUI, which management IP address is recommended for use?
An Implementation Engineer is deploying a FlashArray//XLR5 with two DirectFlash Shelves. The engineer wants to ensure the shelves are installed in the preferred PCIe slots to achieve optimal performance and support. Which PCIe slots should the Implementation Engineer use for connecting the DFS shelves?
After racking a new FlashArray with one data pack, how should DirectFlash modules be installed?
An Implementation Engineer runs check start validate-array-health before starting a FlashArray//X70R3 to FlashArray//X70R5 HWNDU and receives code 60 alert indicating an unhealthy NVRAM module in CH0.NVB1. What action Should the Implementation Engineer take to resolve this?
After rebooting a controller, which command should an Implementation Engineer run to verify all the Purity services have started successfully?
An Implementation Engineer has completed a hardware NDU, but after the upgrade, Purity reports a "health not responding" status when running pureadm status.
Before contacting support, which command should the Implementation Engineer run to review a list of possible logged issues?
A customer has a FlashArray X20R3 with 22/22 data packs in the chassis at 80% space usage and wishes to swap one of the data packs for a 45TB pack. What step needs to be taken to facilitate this consolidation?
A customer wants to expand the capacity of their FlashArray//X10 from 5/5 to 11/11. Which is the correct action to take?
After completing an installation, the customer requests to configure replication IP settings. Where in the GUI does the customer need to navigate in order to do this?
When updating Purity on a new array, which command should the Implementation Engineer run to start the process?
An Implementation Engineer is getting ready to install four DFMs into a 16-module efficiency bundle and notices that the new modules are DFMDs while the installed modules are DFMs. What should the Implementation Engineer do to get the array using a 20-module Wide write group?
Before leaving the site after an install, who is required to provide completion sign-off?
An Implementation Engineer is installing the first DirectFlash Shelf (DFS) on a FlashArray//XR4 controller. Which ports should the Implementation Engineer use for the connection?
Before proceeding with a controller upgrade, phonehome logs must be sent. What command will verify that the logs have been sent?
A customer has ordered several FlashArrays and wants to have ActiveCluster configured. What is the maximum quantity of arrays supported with ActiveCluster?
An Implementation Engineer is onsite to replace a 22TB data pack with a new 91TB (10 x 9.1TB) data pack in a FlashArray//X90R5 Gen 2. The array is at 90% capacity. It currently has 22TB (10 x 2.2TB) in slots 0-9 and 63TB (14 x 4.5TB) in slots 10-23, configured as two separate write groups.
What is a supported method to proceed with the planned capacity migration?
An Implementation Engineer is upgrading a FlashArray//X50R3 to an //X50R4. The array has 10 SAS and 10 DirectFlash modules in the chassis.
What type of controller is required to complete the upgrade?
A customer would like to consolidate their SAS shelves and wants to evacuate multiple shelves in parallel. What is a prerequisite for this procedure?
During an intra-series upgrade from //XR3 to //XR4, which command should the Implementation Engineer run to verify host connectivity before removing the secondary controller?
During an intra-series upgrade from //XR3 to //XR4, which command should the Implementation Engineer run to verify host connectivity before removing the secondary controller?
An Implementation Engineer is performing a FlashArray//XR4 to FlashArray//XL upgrade, and is preparing to remove the XR4 CT0 controller. Which command should the Implementation Engineer run to stop Purity after confirming CT0 is the secondary controller?
During a FlashArray//X to FlashArray//XL hardware upgrade, when should the Implementation Engineer insert the DFMd modules into the FlashArray//XL?
An Implementation Engineer has installed a data pack and the list command shows the drives in "unadmitted" status. Which command should the Implementation Engineer run to complete the admission?
An Implementation Engineer is installing a second DirectFlash Shelf (DFS) on a FlashArray//XR4 controller. How should the Implementation Engineer complete the installation?