API-580 Risk Based Inspection Professional Questions and Answers

Questions 4

Equipment reliability is especially important if leaks can be caused by

Options:

A.

Secondary failures, such as loss of utilities

B.

Primary failures such as leak due to severe corrosion

C.

Tertiary failures due to valve gland packing leak

Buy Now
Questions 5

A Rbi analysis shares many of the techniques and data requirements with a____________.

Options:

A.

Qra

B.

Pha

C.

Hazop

D.

Event tree

Buy Now
Questions 6

The following assumption can bemade that significantly impactthe calculated corrosion rate early in the equipment life

Options:

A.

If the base line thickness were not performed the nominal thickness may be used for the original thickness

B.

If original thickness not available, averaged ut thickness readings may be used

C.

Iftheoriginal thicknessnot available, maximum utthickness readings may be used

Buy Now
Questions 7

The event may be

Options:

A.

Singular or multiple

B.

Certain or uncertain

C.

Loss or gain

D.

Negative or positive

Buy Now
Questions 8

Consequence analysis will aidin preparation of

Options:

A.

Risk ranking of equipment

B.

To understand the probability of failures

C.

To understand about equipment history

Buy Now
Questions 9

In RBI program discrimination between equipment items on the basis of significance of potential failures.

Options:

A.

Failure analysis

B.

Determining failure modes

C.

Consequence analysis

D.

A&B

Buy Now
Questions 10

Qualitative analysis is done and the outcome will be

Options:

A.

Exact number

B.

High, medium and low or range

C.

Only in report

Buy Now
Questions 11

In general the probability of failure is determined by

Options:

A.

Deterioration mechanism

B.

Effectiveness of inspection program

C.

Consequence detailed

D.

A& B

Buy Now
Questions 12

In RBI most of the probability assessment will be

Options:

A.

Only quality assessment

B.

Only quantity assessment

C.

Blend of quality and quantity assessment

Buy Now
Questions 13

Rp 580 is intended to promote consistency and quality in identification,assessment and management of risks pertaining to.................., which could leadto.................

Options:

Buy Now
Questions 14

Potential hazards identified in a pha will often affect the

Options:

A.

Probability of failure side of the risk equation.

B.

Consequence of failure side of the equation

Buy Now
Questions 15

_________are the primary inputs into the probability offailureevaluation.

Options:

A.

The deterioration mechanisms, rates and susceptibilities

B.

Loss of containment f fluid

C.

Fluid toxicity and its concentration

D.

Damage mechanisms and its severity

Buy Now
Questions 16

Results of quantitative consequence analysis are usually expressed in

Options:

A.

Numeric

B.

Ranges from high to low

C.

Frequency

D.

Occasion

Buy Now
Questions 17

______________ provides a consistent methodology for assessing theoptimum combination of methods and frequencies.

Options:

A.

Rbi

B.

Rem

C.

Pha

D.

Hazop

Buy Now
Questions 18

Consequence is always.............For safety aspects

Options:

A.

Negative

B.

Positive

C.

Neutral

Buy Now
Questions 19

Deterioration for specific process equipmentis not available, this can be sourced from

Options:

A.

Published data

B.

Experience with other similar equipment

C.

Previous inspection data

D.

All the above

Buy Now
Questions 20

Effective inspection program can be derived for RBI from

Options:

A.

Proper NDE method best suited for deterioration mechanism

B.

Inspection coverage

C.

Inspection frequency

D.

All the above

Buy Now
Questions 21

Provides a basis for risk evaluation, riskmitigation and risk acceptance

Options:

A.

Risk evaluation

B.

Risk estimation

C.

Risk identification

Buy Now
Exam Code: API-580
Exam Name: Risk Based Inspection Professional
Last Update: May 3, 2024
Questions: 140
API-580 pdf

API-580 PDF

$28  $80
API-580 Engine

API-580 Testing Engine

$33.25  $95
API-580 PDF + Engine

API-580 PDF + Testing Engine

$45.5  $130