An organization is evacuating their current datacenter and moving all workloads to a new datacenter. The organization has a total of 800 workloads to move, and the migration must be completed with no downtime within a planned change window that is scheduled to occur in four weeks.

What migration method will meet the requirements?

Options:

A.

Cross vCenter vMotion

B.

HCX OS Assisted Migration

C.

HCX Bulk Migration

D.

HCX Replication Assisted vMotion

Buy Now
Questions 5

A customer is designing a multi-site VMware Cloud Foundation (VCF) and vSAN Data Protection (DP) architecture to ensure business continuity. The customer's support team must validate the failover and recovery processes before being allowed to deploy into production.

Which two validation activities should be included in the strategy to meet the objective? (Choose two.)

Options:

A.

Conduct recovery plan testing annually, as frequent testing may introduce instability in DR environments.

B.

Assess the impact of failover scenarios on application dependencies and inter-site connectivity.

C.

Configure recovery plans based on generic VMware best practices rather than workload-specific requirements to decrease the architecture complexity.

D.

Perform planned and unplanned failover tests in a controlled environment to validate recovery time objectives.

E.

Configure vSphere HA and DRS features to manage disaster recovery automatically, eliminating the need for additional validation.

Buy Now
Questions 6

As part of an initial stakeholder meeting, one of the stakeholders has stated the following:

    The initial design must be completed within the next 3 months so that hardware can be ordered within the current budget cycle.

How would the architect classify and record this statement?

Options:

A.

A constraint

B.

A risk

C.

An assumption

D.

A requirement

Buy Now
Questions 7

The architect documented a requirement for 99.95% high availability to meet the customer's resiliency needs.

Which two physical design decisions will help meet this requirement in the management domain? (Choose two.)

Options:

A.

Configure vCenter HA for the management domain vCenter server.

B.

ESX Host Uplink Setting: EtherChannel = Enable

C.

Advanced Cluster Setting: das.iostatsinterval = 0

D.

Set the restart priority policy for the vCenter Server appliance to high.

E.

ESX Host Uplink Setting: EtherChannel = Disable

Buy Now
Questions 8

During a requirements gathering workshop, the customer has provided a list of business and technical requirements.

Which requirement should be classified as a business requirement?

Options:

A.

The solution needs to grow by 30% over the next three years.

B.

The solution must consider security and resiliency to ensure continuity.

C.

The solution must provide no Single Point of Failure (SPOF).

D.

The solution should reduce operational costs.

Buy Now
Questions 9

An architect is tasked with designing a VMware Cloud Foundation (VCF) solution for a financial services organization to modernize its core banking applications and high-frequency trading systems using vSAN.

The following requirements were gathered:

• For critical transactional database workloads, the solution must provide low-latency and high performance storage.

• For all non-critical workloads, the solution must provide the most efficient capacity utilization.

Which three design decisions would the architect make to meet the requirements for the workload domain cluster? (Choose three.)

Options:

A.

Configure vSAN Policies (RAID-5) for all critical transactional database workloads.

B.

Deploy a vSAN OSA (All-NVMe) cluster with a minimum of 4 nodes.

C.

Deploy a vSAN ESA cluster with a minimum of 6 nodes.

D.

Configure vSAN Policies (RAID-5/6) for all non-critical workloads.

E.

Configure vSAN Policies (RAID-1) for all workloads.

F.

Configure vSAN Policies (RAID-1) for all critical transactional database workloads.

Buy Now
Questions 10

An architect is tasked to plan for an upgrade of an existing vSphere-only deployment utilizing vSAN to VMware Cloud Foundation (VCF).

Which three new infrastructure components are required for the upgrade? (Choose three.)

Options:

A.

NSX

B.

SDDC Manager

C.

VCF Identity Broker

D.

VCF Operations

E.

vSphere Supervisor

Buy Now
Questions 11

An architect had been given a constraint to use an existing storage array to support the virtual infrastructure design project.

The architect documents the following:

    Assumption 01:The existing storage array has sufficient capacity and performance to support the intended workloads.

    Risk 01:There is a risk that the performance and capacity of the existing storage array may not be sufficient for the solution.

How would the architect mitigate the risk?

Options:

A.

Ensure that the customer allocates budget for new hardware in case the risk is realized.

B.

Setup a RAID mirror configuration on the existing storage array for redundancy.

C.

Ignore the constraint and design the solution using VMware vSAN Express Storage Architecture (ESA).

D.

Request for additional budget to purchase more Fibre Channel switches.

Buy Now
Questions 12

An architect is designing a Business Continuity Disaster Recovery (BCDR) strategy for a Virtual Cloud Foundation (VCF) environment with a management domain and multiple workload domains deployed in two datacenters located in the same city.

During one of the initial workshops with stakeholders, the following information was identified:

    The Recovery Time Objective (RTO) for workloads is 24 hours.

    The management domain must remain continuously available with Recovery Point Objective (RPO) of 0.

    Hardware overhead should be minimized by utilizing standby resources that host test workloads during normal operation.

    Operational overhead should be minimized.

    Latency between both datacenters is 2 ms.

Which design decision should the architect document to satisfy provided requirements?

Options:

A.

Use VCF Automation to redeploy the entire environment in case of a failure.

B.

Implement vSAN stretched cluster for the management domain and Live Recovery for the workload domains.

C.

Back up all workloads daily and store them in a central repository to meet RTO expectations.

D.

Use asynchronous replication for both management and workload domains.

Buy Now
Questions 13

An architect is designing a VMware Cloud Foundation (VCF) deployment to meet the following design requirements:

• Tenants need dedicated external network access.

• The number of NSX Edge clusters should be minimized.

To fulfill these requirements, the architect made a design decision to use a Workload Networking VPC with Full Services Model.

Which additional design decision should be considered as part of the logical network design?

Options:

A.

Deploy the maximum number of 10 NSX Edges into a single Edge cluster.

B.

Install two NSX bare metal Edges with multiple physical interfaces to separate tenants.

C.

Use Virtual Routing and Forwarding (VRF) lite to create a separate VRF TO Gateway for each tenant.

D.

Use NSX Federation providing a dedicated NSX instance for each tenant.

Buy Now
Questions 14

An architect is responsible for designing a VMware Cloud Foundation (VCF)-based private cloud for a customer. The architect noted the following requirements during a design workshop:

    Co-locate application workloads with VCF management component workloads within the same vSphere cluster.

    Shared storage data is always available and 100% current in the event of a single site outage.

    Have two sites available no more than 10 miles apart (10ms latency) connected with high-speed network technology to host their virtual infrastructure.

    Protect against outages of a single site designated as an availability zone.

Which two storage technologies could meet the stated requirements? (Choose two.)

Options:

A.

NVMe over TCP

B.

NVMe over Fibre Channel (FC)

C.

VMFS on Fibre Channel (FC)

D.

vSAN

E.

vSphere Virtual Volumes (vVols)

Buy Now
Questions 15

As a part of designing the VMware Cloud Foundation (VCF) Operations deployment, the architect must ensure that VCF Operations is capable of monitoring the customer's infrastructure made up of a central datacenter and multiple remote sites in different countries.

During a design workshop, the following requirements were identified:

    REQ‑001: Corporate IT users must be able to review performance, alerts, and capacity details from a single management point.

    REQ‑002: The monitoring solution must support local data collection at remote sites to prevent data loss from unstable WAN connections.

    REQ‑003: The monitoring solution must comply with local data sovereignty regulations.

Which deployment model fulfills all design requirements?

Options:

A.

Single VCF fleet with Cloud Proxies in each remote site

B.

Each remote site will be its own VCF fleet.

C.

All remote sites will be a single VCF fleet.

D.

A single fleet with multiple VCF instances

Buy Now
Questions 16

Constraint: Existing stretched cluster model must be used.

Requirement: Minimize management infrastructure downtime.

Which Supervisor deployment model supports the design?

Options:

A.

Three Management Zone Supervisor deployment with HA control plane

B.

Single Management Zone Supervisor deployment with HA control plane

C.

Three Management Zone deployment with Simple Availability control plane

D.

Single Management Zone Supervisor deployment with Simple Availability control plane

Buy Now
Questions 17

An architect is documenting the design for a new VMware Cloud Foundation (VCF) solution and makes the following design decision:

    Two vSphere clusters will be deployed within the single VI workload domain.

What statement should the architect include as an implication of this design decision?

Options:

A.

If the solution needs to be scaled at a future date, additional VI workload domains can be deployed.

B.

Deploying multiple clusters in the single VI workload domain reduces the number of vCenter Server instances that must be managed.

C.

Deploying multiple clusters within the single VI workload domain meets the requirement to segregate Production and Development workloads.

D.

All clusters within the single VI workload domain must use vSAN as their principal storage type.

Buy Now
Questions 18

A customer is deploying VMware Cloud Foundation (VCF) in an enterprise environment. During a series of workshops with stakeholders, the following requirements were identified:

    The network solution must be capable of complete logical isolation.

    The network solution must be capable of supporting independent upgrade cycles for network stacks.

    The network solution must be capable of tenant-specific customization of NSX configurations.

The architect has made the following design decisions:

    The solution will consist of a single VCF instance.

    The solution will include a management domain and two workload domains.

Based on the scenario, which additional design decision meets all of the stated requirements?

Options:

A.

Deploy NSX only in the management domain and use VLAN-backed segments in the workload domains.

B.

Use a global NSX Federation configuration across workload domains.

C.

Use a shared NSX instance across both workload domains.

D.

Deploy a dedicated NSX instance per workload domain.

Buy Now
Exam Code: 2V0-13.25
Exam Name: VMware Cloud Foundation 9.0 Architect
Last Update: Sep 7, 2025
Questions: 60
2V0-13.25 pdf

2V0-13.25 PDF

$25.5  $84.99
2V0-13.25 Engine

2V0-13.25 Testing Engine

$30  $99.99
2V0-13.25 PDF + Engine

2V0-13.25 PDF + Testing Engine

$40.5  $134.99