Following a procedure as written means executing required controls without independently modifying, reordering, or omitting procedural steps. Therefore, B, D, and E are correct.
If the procedure requires a peer check, that verification must occur before proceeding. Required steps must be completed in the specified sequence because procedure order can be essential to equipment state, personnel safety, redundancy, and reliability. Actions and observations should also be documented so there is an accurate operating record and sufficient information for subsequent verification, handover, troubleshooting, or incident review.
Oracle explicitly characterizes Data Center Operations Foundations as a safety-first, procedures-based learning environment and requires learners to follow standard operating and emergency procedures. Oracle's production change-management practices similarly emphasize controlled implementation, validation, approval, and the ability to recover safely from operational problems.
A, C, and F all introduce unauthorized procedural deviation. Even an experienced operator should not improvise by reordering steps, inserting an alternate method, or eliminating required verification simply because conditions appear normal. If the approved procedure no longer matches actual conditions, the correct reliability behavior is to stop, escalate, and obtain appropriate direction or an approved procedural change , rather than modifying the procedure during execution.