Questions 4

What is one dimension of the Team and Technical Agility Core Competency?

Options:

A.

Relentless Improvement

B.

Innovation Culture

C.

Built in Quality

D.

Leading by Example

Buy Now
Questions 5

Which statement is true about uncommitted objectives?

Options:

A.

They help improve predictability

B.

They do not get assigned a business value score

C.

They are extra things the team can do if they have time

D.

The work to deliver uncommitted objectives is not planned into the Iterations during PI planning

Buy Now
Questions 6

How does a team demonstrate progress?

Options:

A.

By presenting status slides

B.

By having the Product Owner verbally communicate to the stakeholders

C.

By showing the actual working product

D.

By showing screen shots of the product

Buy Now
Questions 7

What is the purpose of the Iteration review?

Options:

A.

To serve as a forecasting meeting where the work is estimated for the Program Increments

B.

To show the backlog items and work on possible Solutions for the backlog items

C.

To measure the team's progress by showing working Stories to the stakeholders and getting ^ feedback from them

D.

To identify where there is too much work in the system and where the teams are being ^ overloaded

Buy Now
Questions 8

What is the goal of the SAFe House of Lean model?

Options:

A.

Innovation

B.

Relentless Improvement

C.

Flow

D.

Value

Buy Now
Questions 9

Which factor helps unlock the intrinsic motivation of knowledge workers?

Options:

A.

Pay-for-performance

B.

Autonomy

C.

Parallel development

D.

Team performance incentives

Buy Now
Questions 10

What is one example of differentiating business objectives?

Options:

A.

Enterprise Goals

B.

Portfolio Vision

C.

Strategic Themes

D.

Solution Intent

Buy Now
Questions 11

The Inspect and Adapt event always starts with which activity?

Options:

A.

The PI System Demo

B.

Agreement on the problems to solve

C.

Quantitative measurement

D.

Retrospective and Problem Solving Workshop

Buy Now
Questions 12

When basing decisions on economics, how are lead time, product cost, value, and development expense used?

Options:

A.

To recover money already spent

B.

To understand solution tradeoffs

C.

To limit work in process (WIP)

D.

To take into account sunk costs

Buy Now
Questions 13

According to SAFe, a Feature should be sized to fit into what duration?

Options:

A.

One month

B.

One year

C.

One Iteration

D.

One PI

Buy Now
Questions 14

What is one of the dimensions of Lean-Agile Leadership?

Options:

A.

Emotional Intelligence

B.

Mindset and Principles

C.

Support organizational change

D.

Relentless improvement

Buy Now
Questions 15

Which of the Lean Thinking principles includes the activities from recognizing an opportunity through release and validation?

Options:

A.

Identify the Value Stream for each product

B.

Make value flow without interruptions

C.

Pursue perfection

D.

Precisely specify value by product

Buy Now
Questions 16

Which statement is true about Features and Stories?

Options:

A.

Features should be small enough to fit into an Iteration

B.

Features can be larger than an Iteration but Stories should be small enough to fit into an Iteration

C.

They are prioritized by the team

D.

They are estimated like User Stories

Buy Now
Questions 17

What is one of the tools associated with Design Thinking?

Options:

A.

Set based design

B.

Portfolio canvas

C.

Empathy maps

D.

Behavior-driven development

Buy Now
Questions 18

During the final plan review, ART PI risks are ROAM'ed. What do the letters in ROAM represent?

Options:

A.

Resolved, Owned, Approved, Mitigated

B.

Resolved, Owned, Accepted, Mitigated

C.

Resolved, Owned, Assigned, Mitigated

D.

Resolved, Owned, Active, Mitigated

Buy Now
Questions 19

Which of the core competencies of the Lean Enterprise helps align strategy and execution?

Options:

A.

Team & Technical Agility

B.

Organizational Agility

C.

Agile Product Delivery

D.

Lean Portfolio Management

Buy Now
Questions 20

Restoring the speed and innovation of the entrepreneurial network while leveraging the stability of the hierarchical system is a benefit of what?

Options:

A.

Functional silos

B.

Customer centricity

C.

Dual operating system

D.

Continuous learning culture

Buy Now
Questions 21

Team A has seven developers that can define and build any application the organization requires. Team A works with another team to test and deploy their work. Can Team A be considered a high-functioning Agile Team?

Options:

A.

Yes, because they can build any application the organization requires

B.

No, because they are not cross-functional

C.

No, because they have fewer than ten developers

D.

Yes, because they use another team to deploy

Buy Now
Questions 22

Which statement is true about Iteration planning for Kanban teams?

Options:

A.

Kanban teams estimate their velocity

B.

Kanban teams publish Iteration goals

C.

Kanban teams do not commit to service level agreements

D.

Kanban teams find high value in trying to plan the Iteration in detail

Buy Now
Questions 23

Which pillar in the House of Lean focuses on the Customer being the consumer of the work?

Options:

A.

Value

B.

Innovation

C.

Respect for People & Culture

D.

Flow

Buy Now
Questions 24

Why is it important for teams to understand the optimum batch size for their work?

Options:

A.

To make value flow

B.

To complete more work

C.

To understand transaction costs

D.

To determine the correct cadence

Buy Now
Questions 25

Which of the following statements describes the Product Owner role?

Options:

A.

Prioritizing the ART Backlog

B.

Ensuring quality by testing the Solution

C.

Representing the Customer to the Agile Team

D.

Estimating Stories in the Product Backlog

Buy Now
Questions 26

During which PI planning activity do team members commit to do everything they can to meet the agreed-to-objectives?

Options:

A.

The draft plan review

B.

The second team breakout session

C.

The PI confidence vote

D.

The Management Review and Problem-Solving workshop

Buy Now
Questions 27

What is the role of the System Architect/Engineer?

Options:

A.

To manage dependencies

B.

To implement continuous improvement methods

C.

To guide the teams and support the Architectural Runway

D.

To define the design for the system

Buy Now
Questions 28

Deploy, verify, monitor, & respond are all activities of what?

Options:

A.

Continuous Integration

B.

Continuous Exploration

C.

Continuous Deployment

D.

Release on Demand

Buy Now
Questions 29

What visibility should Scrum Masters provide during the Agile Release Train Sync?

Options:

A.

Visibility into progress and impediments

B.

Visibility into system Solution Intent

C.

Visibility into collaboration deployment

D.

Visibility into single source design decisions

Buy Now
Questions 30

What is one way to address substantial rework?

Options:

A.

Gather all requirements prior to starting the work

B.

Shift reviews right

C.

Reprioritize the work

D.

Regularly engage with the Customer and Business Owner

Buy Now
Questions 31

Team A is writing a Story enabling book shoppers to access their shopping cart from any page on the website. Which of the following examples represents the recommended user voice format for the Story?

Options:

A.

I am a book shopper that wants to access my shopping cart anywhere on the website

B.

I want to view my shopping cart so I can review what I am purchasing

C.

As a book shopper, I want access to my shopping cart from any page, so that I can review what I am purchasing

D.

As a book shopper, I want to access my shopping cart from any page

Buy Now
Questions 32

Which of the following design-thinking techniques helps break down Features while considering the end-to-end user flow?

Options:

A.

Story Mapping

B.

Personas

C.

Gemba walks

D.

Market research

Buy Now
Questions 33

Which of the following SAFe Agile Team types relies on a continually-refined Team Backlog as the primary input to drive value delivery?

Options:

A.

SAFe Team Kanban

B.

SAFe Lean Team

C.

SAFe Epic Team

D.

SAFe Co-located Team

Buy Now
Questions 34

Which three questions should each team member answer during the daily stand-up? (Choose three.)

Are there any impediments that will prevent the team from meeting the Iteration goals?

Options:

A.

How am I splitting the Solutions into Capabilities and Enablers?

B.

How am I optimizing the full Solution?

C.

What did I do yesterday to advance the Iteration goals?

D.

What will I do today to advance the Iteration goals?

E.

How I am contributing to an environment of continuous change?

Buy Now
Questions 35

Which of the following SAFe Core Competencies of Business Agility includes the Customer Centricity and Design Thinking dimension?

Options:

A.

Lean Portfolio Management

B.

Lean-Agile Leadership

C.

Continuous Learning Culture

D.

Agile Product Delivery

Buy Now
Questions 36

What is the purpose of Customer Centricity?

Options:

A.

To design custom-built Customer Solutions

B.

To interpret market rhythms

C.

To build small, partial systems just in time

D.

To understand the Customer's needs

Buy Now
Questions 37

Which of the following principles includes "working software is the primary measure of progress"?

Options:

A.

Agile Product Delivery

B.

Lean Portfolio Management

C.

Lean Thinking

D.

Agile Manifesto

Buy Now
Questions 38

What is found on an ART planning board?

Options:

A.

Epics

B.

Features

C.

User stories

D.

Tasks

Buy Now
Questions 39

When is the System Demo conducted during program execution?

Options:

A.

Each week

B.

When the System Team is ready

C.

At the end of every Iteration

D.

Only when all the stakeholders are available

Buy Now
Questions 40

What is one of the biggest benefits of decentralized decision-making?

Options:

A.

Ensures strategic decisions are made collaboratively

B.

Reduces delays

C.

Improves transparency

D.

Removes accountability from leaders

Buy Now
Questions 41

What is the first step in Kotter's 8-step process for leading change?

Options:

A.

Generate short-term wins

B.

Enlist a volunteer army

C.

Create a sense of urgency

D.

Build a guiding coalition

Buy Now
Questions 42

What is one recommended way of splitting Features into Stories during a PI Planning event?

Options:

A.

Develop the user interface (UI) with sample business logic and database access and then add the actual functionality behind the UI

B.

Implement the database structure first and then implement the business logic and user interface

C.

Develop the functionality first and then test it on a second pass

D.

Implement the simplest variant of the functionality first and then implement the rest as an enhancement

Buy Now
Questions 43

What can be used to script the change to SAFe?

Options:

A.

The Lean-Agile Center of Excellence (LACE) charter

B.

The portfolio canvas

C.

The steps in the Business Agility

D.

The SAFe Implementation Roadmap

Buy Now
Questions 44

Which SAFe Lean-Agile Principle includes an emphasis on "deliver early and often"?

Options:

A.

Organize around value

B.

Make value flow without interruptions

C.

Build incrementally with fast, integrated learning cycles

D.

Take an economic view

Buy Now
Questions 45

Which of the following roles is responsible for prioritizing the Agile Team Backlog?

Options:

A.

Release Train Engineer

B.

Scrum Master/ Team Coach

C.

Release Manager

D.

Product Owner

Buy Now
Questions 46

What is one of the Lean Thinking Principles?

Options:

A.

Individuals and Iterations over processes and tools

B.

Make value flow without interruptions

C.

Working software over comprehensive documentation

D.

Responding to change over following a plan

Buy Now
Questions 47

The analyzing step of the Portfolio Kanban system has a new Epic with a completed Lean business case. What best describes the next step for the Epic?

Options:

A.

It will be implemented once the Epic Owner approves the Lean business case.

B.

It will be moved to the ready state in the Portfolio Kanban if it receives a 'go' decision from Lean Portfolio Management.

C.

It will remain in the analyzing step until one or more Agile Release Trains have the capacity to implement it.

D.

It will be implemented if it has the highest weighted shortest job first (WSJF) ranking

Buy Now
Questions 48

What is one of the Product Owner's responsibilities?

Options:

A.

To manage and prioritize the Team Backlog

B.

To foster normalized estimating within the team

C.

To foster adoption of Agile technical practices

D.

To facilitate team meetings and drive Agile behavior

Buy Now
Questions 49

Which statement applies to uncommitted objectives?

Options:

A.

They are included in the commitment

B.

They are items the team has high confidence in

C.

They are counted when calculating load

D.

They are extra things teams can do if they have time

Buy Now
Questions 50

Which statement correctly describes one aspect of the team's commitment at the end of PI Planning?

Options:

A.

A team commits to all the Features they put on the ART planning board

B.

A team commits only to the PI Objectives with the highest business value

C.

A team commits to all the Stories they put on their PI plan

D.

A team does not commit to uncommitted objectives

Buy Now
Questions 51

Which statement is a principle of the Agile Manifesto?

Options:

A.

Measure everything

B.

Visualize and limit WIP, reduce batch sizes, and manage queue lengths

C.

Simplicity "the art of maximizing the amount of work not done" is essential

D.

Respect for people and culture

Buy Now
Questions 52

What is an example of applying cadence-based synchronization in SAFe?

Options:

A.

Using a Portfolio Kanban system

B.

Allocating budgets to Value Streams

C.

Creating cross-functional ARTs and Agile teams

D.

Conducting a PI Planning event

Buy Now
Questions 53

Who decides the Team PI Objective Business Value scoring after negotiation?

Options:

A.

The Agile Team

B.

The RTE

C.

Business Owner

D.

Product Management

Buy Now
Questions 54

What is one quality practice for software development?

Options:

A.

Rapid prototyping

B.

Refactoring

C.

Continuous exploration

D.

Modeling and simulation

Buy Now
Questions 55

What is the best measure of progress for complex system development?

Options:

A.

System Demo

B.

Prioritized backlog

C.

Inspect and Adapt

D.

Iteration Review

Buy Now
Questions 56

A cumulative flow diagram focuses on which curves?

Options:

A.

Arrival curve ("to do") and evolution curve ("change")

B.

Implementation curve ("movement") and departure curve ("done")

C.

Backlog curve ("work") and departure curve ("done")

D.

Arrival curve ("to-do") and departure curve ("done")

Buy Now
Questions 57

What represents the workflow, activities, and automation needed to deliver new functionality more frequently?

Options:

A.

Portfolio Kanban

B.

The Lean budget Guardrails

C.

The Continuous Delivery Pipeline

D.

The PI Planning process

Buy Now
Questions 58

What does the ART planning board show?

Options:

A.

Risks

B.

Significant dependencies

C.

Capacity and load

D.

Epics

Buy Now
Questions 59

What is the focus of Lean Thinking?

Options:

A.

Reducing delays

B.

Implementing objective measures of progress

C.

Ensuring respect for people and culture

D.

Moving to an iterative development process

Buy Now
Questions 60

James is a Product Owner. It is day seven of the Iteration and his team tells him that they may miss their Iteration commitment. What should James do?

Options:

A.

Support adding an Innovation and Planning Iteration directly after the current Iteration

B.

Agree to add a person from the System Team to complete the work

C.

Ensure the Iteration backlog is accurately prioritized

D.

Support splitting a Story into a coding story and a testing story, and then moving the testing story into the next Iteration

Buy Now
Questions 61

What best supports Innovation in the SAFe House of Lean?

Options:

A.

Visualizing work

B.

Optimizing the whole

C.

Built-in quality

D.

Fast learning cycles

Buy Now
Questions 62

Which of the following statements is true about Roadmaps?

Options:

A.

Communicate intent

B.

Are commitment

C.

Are only adjusted at PI boundaries

D.

Provide a single planning horizon

Buy Now
Questions 63

Which of the following SAFe Lean-Agile principles involves delivering a continuous flow of value to customers in the shortest sustainable lead time?

Options:

A.

Apply systems thinking

B.

Take an economic view

C.

Decentralize decision-making

D.

Make value flow without interruptions

Buy Now
Questions 64

A team finishes developing all of their Stories in the first six days of the Iteration, tests them in the following two days, and fixes bugs in the days remaining. How is the team behaving?

Options:

A.

They are abusing the practice of hardening

B.

They are ignoring nonfunctional requirements within the Iteration

C.

They are waterfalling the Iteration

D.

They are applying the Agile development practice of "separation of concerns"

Buy Now
Questions 65

Which of the following tools can be used to develop a deeper understanding of what customers are seeing, thinking, and feeling while interacting with the Solution?

Options:

A.

Value stream map

B.

Story map

C.

Empathy map

D.

Vision map

Buy Now
Questions 66

Why is it important to decouple deployment from release?

Options:

A.

To allow early access to specific groups of customers

B.

To make deploying of assets a business decision

C.

To remove the need to respond quickly to production issues

D.

To enable releasing functionality on demand to meet business needs

Buy Now
Questions 67

What is the benefit of separating release elements from the Solution?

Options:

A.

It allows the Agile Release Train to demo value every two weeks

B.

It allows Agile Teams to launch untested Features

C.

It allows the release of different Solution elements at different times

D.

It allows the Systems Team to integrate with ease

Buy Now
Questions 68

How can trust be gained between the business and development?

Options:

A.

Automate the delivery pipeline

B.

Deliver predictability

C.

Release new value to production every day

D.

Maintain Iterations as a safe zone

Buy Now
Questions 69

What are Lean Portfolio Management, Agile Product Delivery, and Lean-Agile Leadership?

Options:

A.

Steps in the Business Agility Value Stream

B.

Agile values

C.

SAFe Core Competencies

D.

SAFe Lean-Agile Principles

Buy Now
Questions 70

Which statement describes the balance between emergent design and intentional architecture when talking about building in quality?

Options:

A.

It is required for implementation speed and maturity

B.

It is required for speed of value delivery and Solution Intent

C.

It is required for speed of development and maintainability

D.

It is required for backlog speed and designed refinement

Buy Now
Questions 71

Which statement is true about Iteration goals?

Options:

A.

They verify that teams are working at their full capacity

B.

They align the team to a common Vision of work in the Iteration

C.

They are used to track scope changes over time

D.

They are used to measure business value achieved for each Iteration

Buy Now
Questions 72

Which of the following types of work is found within the Agile Team Backlog?

Options:

A.

Features

B.

Capabilities

C.

User Stories

D.

Epics

Buy Now
Questions 73

When should new approaches be anchored in an organization's culture?

Options:

A.

Culture should not be changed because SAFe respects the current culture.

B.

Culture change comes right after a sense of urgency is created in the organization.

C.

Culture change comes last as a result of changing work habits.

D.

Culture change needs to happen before the SAFe implementation can begin.

Buy Now
Questions 74

Which statement is true about pair work in the Scaled Agile Framework?

Options:

A.

It comes from pair programming in Extreme Programming (XP)

B.

It is a best practice that team members should spend 50% to 100% of the time in pair work

C.

It occurs during Iteration Planning

D.

It is for developers only

Buy Now
Questions 75

Which Lean budget Guardrail helps ensure the appropriate allocation of budgets to balance near-term opportunities with long-term strategy and growth?

Options:

A.

Applying capacity allocation

B.

Guiding investments by horizon

C.

Approving significant initiatives

D.

Continuous Business Owner engagement

Buy Now
Questions 76

Which activity happens in the Inspect and Adapt workshop?

Options:

A.

A demo of the integrated system

B.

Refining the Program backlog

C.

Planning the next PI

D.

A retrospective of the Iteration

Buy Now
Questions 77

What is one issue when organizing around functional silos?

Options:

A.

They do not provide development opportunities for employees

B.

Corporate responsibilities are not a focus

C.

They impede how value flows

D.

Operational activities are not included

Buy Now
Questions 78

What else does the SAFe principle, "unlock the intrinsic motivation of knowledge workers", require besides purpose and minimum possible constraints?

Options:

A.

Autonomy

B.

Innovation

C.

Incentive-based compensation

D.

Transparency

Buy Now
Questions 79

What is the recommended size of an Agile Team?

Options:

A.

5 - 11 people

B.

3 - 5 people

C.

10 - 15 people

D.

8 - 12 people

Buy Now
Questions 80

Why is it important to spend time "in the zone"?

Options:

A.

To reduce queue lengths

B.

To maximize ideal productivity time

C.

To refine productive collaboration

D.

To make work in process visible

Buy Now
Exam Name: SAFe for Teams SP (6.0) - SAFe Practitioner
Last Update: May 14, 2024
Questions: 268
SP-SAFe-Practitioner pdf

SP-SAFe-Practitioner PDF

$28  $80
SP-SAFe-Practitioner Engine

SP-SAFe-Practitioner Testing Engine

$33.25  $95
SP-SAFe-Practitioner PDF + Engine

SP-SAFe-Practitioner PDF + Testing Engine

$45.5  $130