How often is the EDGE Baseline reviewed, including the geographic coverage of EDGE?

Options:

A.

1–2 years

B.

3–5 years

C.

6–8 years

D.

8–10 years

Buy Now
Questions 5

Which of the following passive design features is considered within the EDGE calculation methodology?

Options:

A.

Lighting controls

B.

External shading

C.

Renewable energy

D.

Efficient cooling system

Buy Now
Questions 6

Waste heat recovered from generators can NOT be a source of energy for

Options:

A.

space heating.

B.

mechanical ventilation.

C.

space cooling.

D.

water heating.

Buy Now
Questions 7

Which of the following statements is correct about distinct user roles for an EDGE project team?

Options:

A.

A Project Owner can track the project progress without the ability to edit.

B.

A Project Editor is typically someone from the design team who can edit the project details and documentation.

C.

A Project Viewer can assign or remove any user role and create edit delete projects in the EDGE software.

D.

A Project Administrator is the EDGE Auditor who manages the certification flow of the project on behalf of the owner.

Buy Now
Questions 8

During a design audit, an EDGE Auditor notices that the project does not meet the EDGE standard for energy. Which of the following is an acceptable course of action for the Auditor?

Options:

A.

Ask the Client to use the EDGE tool again to identify options that will take the project comfortably over the EDGE standard.

B.

Contact the design team directly to work with them to find a solution to improve the energy efficiency performance of the project.

C.

As the project does not qualify for EDGE certification, the EDGE Auditor does not have to take any further action on the project.

D.

Based on the Auditor’s previous experience on working on similar projects, provide a list of measures that the Client could incorporate in the project that will take them comfortably over the EDGE standard.

Buy Now
Questions 9

Is it possible to be both the EDGE Expert and Auditor on a project?

Options:

A.

No, an EDGE Expert cannot be the EDGE Auditor on the same project.

B.

No, even if EDGE Certifier agrees to special terms to have no conflict of interest.

C.

Yes, they can be both an EDGE Auditor and EDGE Expert in all cases.

D.

Yes, but only in the case that there are no other EDGE Auditors available for the project.

Buy Now
Questions 10

For existing buildings, which of the following elements would increase the embodied carbon in the EDGE assessment?

Options:

A.

Existing roof construction

B.

External shading devices

C.

New materials included in the retrofit

D.

New mechanical systems included in the retrofit

Buy Now
Questions 11

Which of the following can deliver the highest efficiency in fans and pumps?

Options:

A.

Two speed drive

B.

Single speed drive

C.

Constant speed drive

D.

Variable speed drive

Buy Now
Questions 12

In the EDGE software, what is the unit of the embodied carbon of the material?

Options:

A.

kgCO2

B.

MJ

C.

BTU

D.

kWh

Buy Now
Questions 13

Variable speed drives in HVAC systems help:

Options:

A.

Reduce the speed.

B.

Increase the speed.

C.

Reduce energy consumption.

D.

Reduce water consumption.

Buy Now
Questions 14

Which of the following is NOT a characteristic of the EDGE standard?

Options:

A.

Fast tool with ideal measures for the best return on investment

B.

Holistic approach that takes into account wider sustainability issues

C.

Smart, as capital costs and payback period for buildings are displayed

D.

Simple, as beneath the intuitive interface is a powerful engine that understands local climate and how buildings will be used

Buy Now
Questions 15

Ceiling fans are an efficient way to increase air movement and therefore thermal comfort. Which of the following forms part of the evidence to demonstrate compliance at the design stage?

Options:

A.

Photographs of the installed ceiling fans

B.

Computational Fluid Dynamics (CFD) assessment of all habitable spaces

C.

Manufacturer's data sheet of the ceiling fans

D.

Purchase receipts of the ceiling fans

Buy Now
Questions 16

Which of the following may NOT lead to a higher adoption of green building practices?

Options:

A.

Green building regulations

B.

Lower electricity supply costs

C.

Public awareness and capacity building

D.

Clear visibility of estimated savings and cost of green measures

Buy Now
Questions 17

Which of the following elements is considered in EDGE to estimate water use in homes?

Options:

A.

HVAC

B.

Water heating

C.

Exterior fountains

D.

Solar water heaters

Buy Now
Questions 18

Which of the following wall solar reflectivity indexes would be the most energy efficient in a hot climate?

Options:

A.

0.2

B.

0.3

C.

0.4

D.

0.7

Buy Now
Questions 19

How often should the EDGE Zero Carbon certification be renewed?

Options:

A.

Initially after two years, subsequently every four years

B.

Initially after four years, subsequently every two years

C.

Every two years if using carbon offsets, or every four years if using 100% renewable energy

D.

Every four years if using carbon offsets, or every two years if using 100% renewable energy

Buy Now
Questions 20

An EDGE Auditor is auditing a hospital design for Preliminary Certification. The EDGE Client has included photovoltaics as one of the energy measures resulting in an overall 21% saving in energy. The Auditor observes the photovoltaics are facing the wrong direction. What action should the Auditor take?

Options:

A.

Contact the design team directly and suggest a better orientation for the photovoltaics.

B.

Adjust the area of photovoltaic panels in the assessment to allow for reduction in energy output.

C.

Assess the energy measures as they are presented to you, without changing the photovoltaic selection.

D.

Reject photovoltaics from the selected set of energy measures and notify the Client regarding the orientation.

Buy Now
Questions 21

A site audit must take place within how many months of the project’s practical completion date?

Options:

A.

12 months

B.

18 months

C.

24 months

D.

36 months

Buy Now
Questions 22

An EDGE Auditor has received initial documentation from a Client which implies that measures not selected on the downloaded PDF can be claimed. What should the Auditor do?

Options:

A.

The Auditor should ask for advice from the EDGE Partner and then take action.

B.

The Auditor should modify the self-assessment and submit the project for certification.

C.

Inform the Client to update the EDGE software and prepare a new PDF.

D.

As submission documents are correct, the Auditor should ignore the error on PDF.

Buy Now
Questions 23

Which of the following does NOT contribute to an EDGE Auditor maintaining their Auditor status?

Options:

A.

Performing at least one project site audit every two years.

B.

Studying the EDGE user guides as and when they are updated.

C.

Retaking the auditor exam.

D.

Attending refresher training.

Buy Now
Questions 24

How often should the EDGE Advanced certification be renewed?

Options:

A.

Renewal is done every two years.

B.

Renewal is not required.

C.

First renewal is done after two years and subsequently every four years.

D.

First renewal is done after four years and subsequently every two years.

Buy Now
Questions 25

To maintain their licensed status, what must EDGE Auditors do?

Options:

A.

Undertake at least one building project audit every two years.

B.

Attend refresher training for at least two hours every two years.

C.

Attend refresher training for at least two hours every three years.

D.

Undertake at least one building project audit every three years.

Buy Now
Questions 26

A medium-rise building comprises retail on the first two floors with offices on succeeding floors (third to fifth). If one of the tenants on the third floor aims for EDGE certification, which building type should be used?

Options:

A.

Office

B.

Retail

C.

Mixed-use

D.

Core and Shell

Buy Now
Questions 27

A potential EDGE Client is pursuing EDGE Zero Carbon certification for a museum. Which of the following statements is correct?

Options:

A.

The project team can select any typology they consider applicable.

B.

The building must be operating for at least 6 months at 75% occupancy.

C.

The project cannot be certified because EDGE does not have a ‘museum’ typology.

D.

The building must be operating for at least 12 months at 75% occupancy.

Buy Now
Questions 28

VRV / VRF System is best used for:

Options:

A.

Single zone space

B.

Single zone office space

C.

Multizone space

D.

Meeting space

Buy Now
Questions 29

Other than embodied carbon, the selection of wall materials has an impact on

Options:

A.

Window to Wall Ratio WWR.

B.

energy consumption.

C.

internal heat gains.

D.

solar heat gain coefficient.

Buy Now
Questions 30

Which of the following types of energy consumption results from EDGE?

Options:

A.

Primary energy

B.

Electrical energy

C.

Delivered energy

D.

Renewable energy

Buy Now
Questions 31

To claim efficiency measure Insulation for Cold Storage Envelope, which of the following documents is required as evidence at the preliminary certification stage?

Options:

A.

Calculations of Coefficient of Performance (COP)

B.

Manufacturer's data sheets for the HVAC system

C.

Drawing(s) showing the U-value specification of the cold storage envelope

D.

Purchase receipts showing the U-value specification of the cold storage envelope

Buy Now
Questions 32

What is a valid use for collected rainwater to qualify for savings under EDGE?

Options:

A.

Ground water recharge

B.

Redirecting to nearest drain

C.

Redirecting to nearest water body

D.

Using for air-conditioning in cooling towers

Buy Now
Questions 33

Client has provided the specification as per the image for low flow shower heads. What is the flow rate for shower heads that should have been entered to EDGE software?

Options:

A.

4

B.

6

C.

1,315

D.

3,590

Buy Now
Exam Code: EDGE-Expert
Exam Name: Excellence in Design for Greater Efficiencies (EDGE Expert) Exam
Last Update: Mar 8, 2026
Questions: 110
EDGE-Expert pdf

EDGE-Expert PDF

$25.5  $84.99
EDGE-Expert Engine

EDGE-Expert Testing Engine

$30  $99.99
EDGE-Expert PDF + Engine

EDGE-Expert PDF + Testing Engine

$40.5  $134.99