Labour Day Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: geek65

ECP-383 Ericsson Certified Associate - Radio Network Optimization Questions and Answers

Questions 4

Caller A is on a VoLTE call with Caller B. Suddenly Caller A is no longer able to hear Caller B but Caller B can hear Caller A.

Which two call legs and directions should be analyzed first in this scenario? (Choose two.)

Options:

A.

the Caller B downlink

B.

the Caller A uplink

C.

the Caller A downlink

D.

the Caller B uplink

Buy Now
Questions 5

Which two statements are true about the Antenna Integrated Radio (AIR)? (Choose two.)

Options:

A.

The AIR is a hardware unit that integrates the radio and the antenna.

B.

The AIR replaces the digital/baseband unit.

C.

The AIR in an LTE system is directly connected with the MME using the SI interface.

D.

The AIR can replace the standard RU/RRU and antenna.

Buy Now
Questions 6

Review the exhibit.

Using a radio performance monitoring tool, you fetch counters CI and C2 and calculate KPI K for the four 15-minute ROPs in an hour. The values obtained for the CI and C2 counters and for KPI K are shown In the exhibit.

In this scenario, what is the hourly value of KPI K?

Options:

A.

The value obtained for KPI K is 97%.

B.

The value obtained for KPI K is 96%.

C.

The value obtained for KPI K is 95%.

D.

The value obtained for KPI K is 94%.

Buy Now
Questions 7

Which three service KPIs (S-KPIs) are obtained by DT measurement? (Choose three.)

Options:

A.

bearer drop rate

B.

handover success rate

C.

additional status total time for social media

D.

initial buffering time for video

E.

interactive time for Web browsing

Buy Now
Questions 8

An operator receives customer complaints from an indoor location. The Issues result from a bad neighbor plan in a single RAT and frequency network.

Which two optimization processes would you use to resolve the problem? (Choose two.)

Options:

A.

call trace based neighbor optimization

B.

drive test based neighbor optimization

C.

PM counter based neighbor optimization

D.

prediction based neighbor optimization

Buy Now
Questions 9

Several operators are using a Multi Operator Core Network (MOCN) with the Shared LTE RAN feature. Which element is shared by the operators in this scenario?

Options:

A.

eNodeB

B.

IMS

C.

MME

D.

SGW

Buy Now
Exam Code: ECP-383
Exam Name: Ericsson Certified Associate - Radio Network Optimization
Last Update: May 5, 2024
Questions: 62
ECP-383 pdf

ECP-383 PDF

$28  $80
ECP-383 Engine

ECP-383 Testing Engine

$33.25  $95
ECP-383 PDF + Engine

ECP-383 PDF + Testing Engine

$45.5  $130