Labour Day Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: geek65

CQE Certified Quality Engineer Questions and Answers

Questions 4

An improvement in quality costs is MOST clearly indicated when:

Options:

A.

Appraisal and failure costs drop.

B.

Prevention costs increase.

C.

Total quality costs fall below 15% of total sales.

D.

Management objectives are met.

Buy Now
Questions 5

Given the data below, what is the 90% confidence interval for the variance?

22, 23, 19, 17, 29, 25

Options:

A.

4.21 - 99.07

B.

15.32 - 28.66

C.

8.27 - 79.88

D.

16.87 - 56.52

Buy Now
Questions 6

What is the key ranking difference between the Deming philosophy and the Malcolm Baldrige award criteria?

Options:

A.

Deming prescribes "all or nothing" propositions but MBNQA ranks categories with different weights.

B.

The MBNQA ranks "business results" and "customer focus", but Deming does not consider theseitems.

C.

The MBNQA has seven categories compared to Deming's 14 points.

D.

There is no recognized rating system for the MBNQA.

Buy Now
Questions 7

The primary reason that nonconforming material should be identified and segregated is

Options:

A.

So that the cause of nonconformity can be determined.

B.

So it cannot be used in production without proper authorization.

C.

To obtain samples of poor workmanship for use in the company's training program.

D.

So that responsibility can be determined and disciplinary action taken.

Buy Now
Questions 8

Which of the following statements describes discrete data?

Options:

A.

It takes 3 hours 48 minutes to fly from LA to New York.

B.

Of 225 people on the airplane, 85 had connecting flights.

C.

The flight arrived at 9:08 PM.

D.

There were 5,923 gallons of fuel consumed on the flight.

Buy Now
Questions 9

A normal (Gaussian) distribution curve is

Options:

A.

Bell shaped.

B.

Dome shaped.

C.

Pear shaped.

D.

Positively skewed.

Buy Now
Questions 10

Which of the following would be the MOST important considerations when establishing inspection points within a production operation?

Ⅰ. Inspection to prevent defects from entering the system.

Ⅱ. Inspection after all operations (both manual and automated).

Ⅲ. Inspection prior to a painting or masking operation.

Options:

A.

I only

B.

I andIIonly

C.

I andIIIonly

D.

I,IIandIII

Buy Now
Questions 11

An electronics firm was experiencing high rejections in their multiple connector manufacturing departments. "p" charts were introduced as part of a program to reduce defectives. Control limits were based on prior history, using the formula:

P' is the historical value of percent defective and n is the number of pieces inspected each week. After six weeks, the following record was accumulated

1,000 pieces were inspected each week in each department. Which department(s) exhibited a point or points out of control during this period (round off calculations to nearest tenth of a percentage point)?

Options:

A.

Department 104.

B.

Department 105.

C.

Department 106.

D.

All of the department.

Buy Now
Questions 12

Which of the following would be considered the WEAKEST reason to initiate an audit?

Options:

A.

To compare actual practice to a defined standard.

B.

Follow-up on corrective action.

C.

Identify the root cause of a recent problem.

D.

Verify that a quality system continues to meet requirements.

Buy Now
Questions 13

Determine the coefficient of variation for the last 500 pilot plant test runs of high temperature film having a mean of 900 Kelvin with a standard deviation of 54.

Options:

A.

6%

B.

16.7%

C.

6%

D.

31%

Buy Now
Questions 14

Compute the upper control limit for an s chart, based on a sample size of 10, if the process is in control with a mean of 40 and a sample standard deviation of 7.

Options:

A.

11.7

B.

13.3

C.

15.7

D.

21

Buy Now
Questions 15

Which of the following are the MOST logical reasons for providing source inspection?

Ⅰ. The supplier has consistently shown poor out-going quality.

Ⅱ. The key inspection points are hidden after assembly at the suppliers' plant.

Ⅲ. The supplier requests the inspection to save them potential shipping expenses.

Ⅳ. The criticality of the product warrants it.

Options:

A.

I,IIandIVonly

B.

IIandIVonly

C.

II,IIIandIVonly

D.

I,II,IIIandIV

Buy Now
Questions 16

If a distribution is skewed to the right

Options:

A.

The mode is between the median and the mean.

B.

The mean is between the mode and the median.

C.

The mode is greater than the median.

D.

None of the above.

Buy Now
Questions 17

A box contains 27 black and 3 red balls. A random sample of 5 balls is drawn without replacement. What is the probability that the sample contains one red ball?

Options:

A.

0.108

B.

0.270

C.

0.369

D.

0.500

Buy Now
Questions 18

What are the major disadvantages of having an improvement team that is too large?

Ⅰ. Difficulty in having constructive input from the entire group.

Ⅱ. Difficulty in arriving at consensus.

Ⅲ. Difficulty in finding large meeting facilities.

Ⅳ. Difficulty, on the part of the recorder, in keeping up with more paperwork.

Options:

A.

Ionly

B.

IandIIonly

C.

I,IIandIIIonly

D.

I, II,IIIandIV

Buy Now
Questions 19

During the building phase of improvement team development, which of the following properly describes team activities?

Ⅰ. The team leader is usually directive.

Ⅱ. The team leader often delegates tasks.

Ⅲ. Team members prioritize and perform duties.

Ⅳ. Team members are uncertain of their duties.

Options:

A.

IIandIIIonly

B.

I,IIandIIIonly

C.

IandIV only

D.

II,IIIandIV only

Buy Now
Questions 20

Which of the following problem-solving tools is a column graph which displays a static picture of the process?

Options:

A.

Pareto chart.

B.

Control chart.

C.

Histogram.

D.

Cause and effect diagram.

Buy Now
Questions 21

The hypergeometric distribution should be used instead of the binomial distribution when

Options:

A.

There are more than 2 outcomes on a single trial.

B.

Each trial in independent.

C.

Sampling does not involve replacement.

D.

There is a fixed number of trials.

Buy Now
Questions 22

Given the data below is normally distributed, and the population standard deviation is 3.1, what is the 90% confidence interval for the mean?

22, 23, 19, 17, 29, 25

Options:

A.

20.88 - 24.12

B.

20.42 - 24.59

C.

21.65 - 23.35

D.

17.4 - 27.6

Buy Now
Questions 23

How many outcomes are possible when performing a single trial of a binomial experiment?

Options:

A.

1

B.

2

C.

3

D.

4

Buy Now
Questions 24

Which of the following control charts are more efficient than an X-bar chart at detecting small shifts in the mean?

Ⅰ. CUSUM.

Ⅱ. EWQR.

Ⅲ. EWMA.

Options:

A.

I only

B.

IIonly

C.

IIIonly

D.

I andIIIonly

Buy Now
Exam Code: CQE
Exam Name: Certified Quality Engineer
Last Update: May 7, 2024
Questions: 160
CQE pdf

CQE PDF

$28  $80
CQE Engine

CQE Testing Engine

$33.25  $95
CQE PDF + Engine

CQE PDF + Testing Engine

$45.5  $130