Combustible construction forming concealed spaces shall be protected with noncombustible protection with an assigned time of 40 minutes in which construction type?

Options:

A.

Type IV-A

B.

Type IV-B

C.

Type IV-C

D.

Type IV-HT

Buy Now
Questions 5

In mass timber construction of Type IV-C, the fire-resistance ratings of bearing walls are permitted to be reduced by _____ where supporting a roof only.

Options:

A.

30-minutes

B.

45-minutes

C.

1-hour

D.

2-hours

Buy Now
Questions 6

Buildings of Types IV-A, IV-B, and IV-C construction designed to be greater than six stories above grade plane shall meet which of the following requirements for fire safety practices during construction?

Options:

A.

Standpipes shall be provided in accordance with IFC Section 3313.

B.

The IFC specifically requires a portable water supply.

C.

Required exterior wall coverings on all floor levels more than 2 levels below the floor under construction, including mezzanines.

D.

At least two layers of noncombustible protection, where noncombustible protection is required for the building element, on all mass timber more than 4 stories below the uppermost floor under construction.

Buy Now
Questions 7

Refer to the exhibit by clicking on the EXHIBIT button above.

Given: The connections between the glulam beam and CLT panels all require a fire-resistance rating of 2 hours, and wood cover is designed per AWC Technical Report 10 to provide the entire 2 hours of protection.

The bearing area between the CLT and glulam is the minimum required.

What are the minimum dimensions, in inches, for the wood block shown in red?

Options:

A.

1.5 x 1.5

B.

2 x 2

C.

3 x 3

D.

4 x 4

Buy Now
Questions 8

Periodic special inspection of sealants or adhesives shall be conducted where sealants or adhesives are part of a mass timber building element as designated in the approved construction documents.

All of the following statements are correct in reference to sealants or adhesives in mass timber buildings except:

Options:

A.

Sealants shall meet the requirements of ASTM C920.

B.

Adhesives shall meet the requirements of ASTM D3498.

C.

Special inspection of mass timber sealing requirements also apply to joints.

D.

Sealants at abutting edges and intersection of mass timber buildings need periodic inspections.

Buy Now
Questions 9

In Type IV-C construction, the fire-resistance rating provided by protection over a connection can be determined by which of the following?

Options:

A.

Testing the fasteners used in the assembly.

B.

Testing the protection covering the connection.

C.

Calculating the temperature rise of the structural element being protected.

D.

Calculating the temperature rise of the supported member used in the connection.

Buy Now
Questions 10

Both surfaces of a two-hour-rated mass timber wall that serves as a required separation between a Group R and Group I-2 occupancy in a Type IV-C building must be protected by at least which of the following?

Options:

A.

No requirement as long as the wall is 2-hour rated

B.

Materials providing at least 1 hour of fire resistance

C.

One half inch gypsum board or a noncombustible equivalent

D.

Two layers of 5/8-inch Type X gypsum board or equivalent

Buy Now
Questions 11

Are mass timber elements permitted to serve as a fire barrier to an adjacent occupancy if they are separated from the interior of the building with an approved thermal barrier consisting of a minimum of 1/2 in. gypsum board or a noncombustible equivalent?

Options:

A.

No

B.

Yes, for Type IV-B only

C.

Yes, for Type IV-HT

D.

Yes for Type IV-B and IV-C

Buy Now
Questions 12

Regarding water supply for the protection of buildings under construction, when combustible building materials of the building under construction are delivered to a site, the minimum fire flow provided shall be _____ gpm.

Options:

A.

100

B.

200

C.

500

D.

750

Buy Now
Questions 13

Each of the following is true for special inspection of mass timber construction except:

Options:

A.

continuous special inspection is required for bolted connections.

B.

periodic special inspection is required for concealed connections.

C.

periodic special inspection is required for the erection of mass timber construction.

D.

periodic special inspection is required to verify use of pre-drilled holes for threaded fasteners where required.

Buy Now
Questions 14

Which of the following is true regarding Type IV-B unprotected portions of mass timber ceilings and walls?

Options:

A.

All of the mass timber may be exposed.

B.

None of the mass timber may be exposed.

C.

20% of the floor area of the ceilings and 40% of the floor area of the walls may be exposed under certain conditions.

D.

40% of the floor area of the ceilings and 20% of the floor area of the walls may be exposed under certain conditions.

Buy Now
Questions 15

Refer to the exhibit by clicking on the EXHIBIT button above.

In the detail shown, which fasteners require fire protection according to AWC Technical Report 10?

Options:

A.

Those in the 2x2 block

B.

Those in the 2x10s

C.

Those in the gypsum filler

D.

The 1/2 in. lag screws attaching the steel ledger

Buy Now
Questions 16

For Type IV-A construction, noncombustible protection shall provide what fraction of the required fire-resistance rating for building elements?

Options:

A.

1/3

B.

1/2

C.

2/3

D.

3/4

Buy Now
Questions 17

Where Type X gypsum board serves as noncombustible protection for interior surfaces of wall and ceiling assemblies, all of the following code provisions are correct except:

Options:

A.

Screws shall penetrate at least 1 in. into mass timber.

B.

Screws shall be spaced 12 in. on center in both directions.

C.

Panel edges of any layer shall be offset 18 inches from those of the previous layer.

D.

Panel edges of the base layer shall be taped and finished with joint compound.

Buy Now
Questions 18

Refer to the figure by clicking on the EXHIBIT button above.

In Type IV-B construction, based on a 900 sq. ft. floor area, a 30 ' room width, and a 12 in. x 18 in. beam as shown in the Figure, the maximum length of the unprotected portion of the mass timber ceiling (dimension X) is _____ feet.

Options:

A.

2

B.

4

C.

6

D.

8

Buy Now
Questions 19

Periodic special inspection of sealants or adhesives as specified by the International Building Code Section 703.7 shall be conducted at which of the following locations?

Options:

A.

At “joints” as defined in IBC Section 202.

B.

Where they are a required component of a tested fire-resistance-rated assembly.

C.

At abutting edges and intersections of mass timber building elements required to be fire-resistance rated.

D.

At abutting intersections of mass timber building elements and building elements of other materials where one or the other are required to be fire-resistance rated.

Buy Now
Questions 20

The building owner shall be responsible for each of the following for fire safety during construction except:

Options:

A.

completion of a daily fire safety inspection at the project site by the site safety director.

B.

documentation and maintenance on-site of each inspection’s results until a certificate of occupancy has been issued.

C.

securing documentation in a fire- and water-resistant safe until a certificate of occupancy has been issued.

D.

making documentation immediately available on-site for presentation to the fire code official upon request.

Buy Now
Questions 21

For Type IV-A, IV-B, and IV-C construction, each of the following materials on the exterior side of mass timber exterior walls is required to be noncombustible except:

Options:

A.

insulation.

B.

exterior cladding.

C.

architectural trim.

D.

water-resistive barrier.

Buy Now
Questions 22

Which of the following best describes the required protection for mass timber hoistway enclosure walls in Type IV-C construction?

Options:

A.

Noncombustible protection of at least 40 minutes fire resistance

B.

No requirement, but walls must achieve the required fire-resistance rating

C.

Noncombustible protection of at least 1/2 in. gypsum board or equivalent

D.

fire-retardant-treated-wood sheathing, 1/2-inch gypsum board, or a noncombustible material

Buy Now
Questions 23

In mass timber construction of Type IV-B, each of the following is suitable for use as fireblocking except:

Options:

A.

mineral wool.

B.

one-half-inch gypsum board.

C.

7/16-inch wood structural panels.

D.

mass timber complying with IBC Section 2304.11.

Buy Now
Questions 24

The maximum allowable height for a Group I-4 building of Type IV-B construction provided with an automatic sprinkler system in accordance with Section 903.3.1.1 is _____ ft.

Options:

A.

60

B.

120

C.

180

D.

270

Buy Now
Exam Name: 93-Tall-Mass-Timber-Buildings
Last Update: Aug 29, 2026
Questions: 80
93-Tall-Mass-Timber-Buildings pdf

93-Tall-Mass-Timber-Buildings PDF

$21.25  $84.99
93-Tall-Mass-Timber-Buildings Engine

93-Tall-Mass-Timber-Buildings Testing Engine

$25  $99.99
93-Tall-Mass-Timber-Buildings PDF + Engine

93-Tall-Mass-Timber-Buildings PDF + Testing Engine

$33.75  $134.99