Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: geek65

1z0-1075-24 Oracle Manufacturing Cloud 2024 Implementation Professional Questions and Answers

Questions 4

Your client needs to implement operational checks for compliance with training and job requirements. Which four statements are true about this functionality?

Options:

A.

A qualified operator need not be specified to report resource transactions.

B.

You have the ability to associate a Job profile with a Work definition operation resource.

C.

The qualification Is enforced during reporting of labor usage.

D.

You have the ability to associate a Job profile with a Standard operation resource.

E.

You do not have the ability to associate a Job profile with a Work order operation resource.

F.

The qualification Is used to warn a production supervisor If they assign operators that don't meet the skill requirements against the resource.

Buy Now
Questions 5

Two work definitions are created in the application: one for Engine Finished Good and the other for Pallet Finished Good. The Engine Finished Good item should have Pallet Finished Good as one of its components.

How can you establish the relationship between the Pallet and Engine work definitions?

Options:

A.

Create a subinventory to serve as the completion subinventory for yielding Pallet, and then use the same subinventory to serve as the supply subinventory of Pallet in the work definition created for Engine.

B.

Work definition versions can be used to tie the work orders.

C.

Assign a higher priority to the work definition created for Engine and a lower one to the work definition for Pallet.

D.

The two work definitions can be tied through Project or Selban numbers.

Buy Now
Questions 6

Your customer runs two daily shifts in their plant: morning shift and evening shift. A resource, LATHE, is assigned to the work center W1. There are five units of LATHE available, of which three units are available for the morning shift and the remaining units for the evening shift.

Which two actions must the customer perform to associate LATHE with W1?

Options:

A.

Deselect the Available 24 Hours check box and, in the Resource Availability region, enter 40% against LATHE In the Evening Shift column.

B.

Deselect the Available 24 Hours check box and, in the Resource Availability region, enter ~z against LATHE in the Evening Shift column,

C.

Deselect the Available 24 Hours check box and, in the Resource Availability region, enter 3 against LATHE in the Morning Shift column.

D.

Select the Available 24 Hours check box and, in the Resource Availability region, enter 2 against LATHE in the Evening Shift column.

E.

Select the Available 24 Hours check box and, in the Resource Availability region, enter 3 against LATHE In the Morning Shift column.

F.

Deselect the Available 24 Hours check box and, in the Resource Availability region, enter 60% against LATHE in the Morning Shift column.

Buy Now
Questions 7

You create a work order, in which some of the operations have components with the Push supply type. While reporting material consumption on the Report Material Transaction page, you want the Push components to default whenever the operator selects Show Components.

Which setup task must you perform in the Manage Plant Parameters section to achieve this?

Options:

A.

Set Default Transaction Mode to Entered and Default Transaction Quantity to Work Definition.

B.

Set Default Transaction Mode to Work Definition.

C.

Set Default Transaction Mode to AIL

D.

Set Default Transaction Mode to Entered.

Buy Now
Questions 8

Which three statements are true about managing Units of Measure?

Options:

A.

You must define the unit of measure class with a base unit of measure.

B.

If you want to transact items in units of measure that belong to classes other than their primary UOM class, you must define conversions between the base units of measure in different UOM classes.

C.

A unit of measure standard conversion specifies the conversion factor by which the unit of measure is equivalent to the unit of measure class.

D.

Conversions between classes are unique for each item; the conversion rate varies for intraclass units of measure.

E.

A unit of measure conversion is a mathematical relationship between two different units of measure.

Buy Now
Questions 9

Your client has asked you to implement the functionality to ensure that the system checks for Qualified Operators when reporting labor usage.

Which statement is NOT true?

Options:

A.

Validation of operator qualification is also enforced when reporting operation is completed through the dispatch list.

B.

You will need to report a qualified operator to manually report resource transactions, if the resource has a job profile associated with It.

C.

Quick Complete is allowed for operations that contain resources with associated job profiles.

D.

Qualified labor must be reported at the resource train stop.

Buy Now
Questions 10

Your customer is a light assembly manufacturing company that doesn't require shop floor control. A Manufacturing Engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.

Which three steps must they perform and verify in the Work Definition area?

Options:

A.

Select a resource to be used in automatic work definition by enabling the Default attribute for automatic work definition.

B.

Ensure the predefined work definition name ORA_MAIN is active.

C.

Ensure the item is a standard item with a secondary item structure.

D.

Ensure there is only one default standard operation at any point in time.

E.

Select a standard operation to be used in automatic work definition by enabling the Default attribute for automatic work definition.

Buy Now
Questions 11

The pick release of a project work order creates movement requests with the project and the task from the work order.

Which statement is NOT true about this?

Options:

A.

The expenditure type, expenditure date, and expenditure organization are derived when the work-ln-process material issue or work-in-process material pick transactions are interfaced to Costing.

B.

The expenditure type for the item is derived based on the Default Expenditure Type attribute in Inventory Management. The picks for the work order ore grouped by project costing, project, and task using pick slip grouping rules.

C.

The expenditure type and the expenditure organization from the work order are referenced onto the shop floor movement requests.

D.

The expenditure type and the expenditure organization from the work order are not referenced onto the shop floor movement requests.

Buy Now
Questions 12

Production operations need operators to execute the right steps to produce quality products, so want to use "View Document Items on a Dispatch List."

Which statement is NOT true?

Options:

A.

You cannot view the document item attachment on the Manage Supplier Operations page.

B.

You will always see the active revision of the attachment from currently effective revision of the document from Master Organization.

C.

You can add attachments to the document item and invoke the engineering change order to release the latest revision of the document item and attachment.

D.

You can view the document item attachment in the dispatch list and on the Manage Supplier Operations page by using the attachment icon.

Buy Now
Questions 13

You are defining a standard operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it.

Which setup task must you perform to achieve this?

Options:

A.

Deselect the Count Point check box while defining the standard operation.

B.

Select the Automatically Transact check box while defining the standard operation.

C.

Select the Count Point check box while defining the standard operation.

D.

Ensure that the Charge Type of the resource is Automatic.

Buy Now
Questions 14

A Production Operator is executing a work order at your plant. After completing move transactions, they notice that they have performed some incorrect move operations, including incorrect scrap and reject transactions.

They must perform a reverse transaction to correct the errors. The operations are not count point-enabled and not auto-charged.

Which four transactions are required to correct this situation?

Options:

A.

Reverse material issued to a work order.

B.

Reverse at an operation.

C.

Reverse from Scrap to Ready.

D.

Reverse from Reject to Ready.

E.

Reverse the product at the last operation.

F.

Reverse resources charged to a work order.

Buy Now
Questions 15

Which three are Cost accounting methods'

Options:

A.

Perpetual Average Cost

B.

Layer Cost, also known as "LIFO"

C.

Frozen Standard Cost

D.

Actual Cost, also known as "FIFO"

E.

Periodic Actual Cost

Buy Now
Exam Code: 1z0-1075-24
Exam Name: Oracle Manufacturing Cloud 2024 Implementation Professional
Last Update: Jun 15, 2025
Questions: 50
1z0-1075-24 pdf

1z0-1075-24 PDF

$29.75  $84.99
1z0-1075-24 Engine

1z0-1075-24 Testing Engine

$35  $99.99
1z0-1075-24 PDF + Engine

1z0-1075-24 PDF + Testing Engine

$47.25  $134.99